Campo Grande – MS Received Commitment of R$ 181.2 Million from the State Government for Infrastructure Works for the Next Three Years.
Many job openings are coming! The R$ 181.2 million ensures the continuity of ongoing works and projects as well as the initiation of other infrastructure investments. 1000 openings in free in-person and distance courses (EAD) for those who are unemployed
Read Also
- Modec Starts New Offshore Selection Process, Positions are for Seafarers, Technicians, and Radio Operators
- Tonon Energy Plant Declared Bankrupt. 600 Industrial Workers Will Lose Their Jobs
- Petrobras Will Sell Three Large Offshore Pipelines That Connect Pre-Salt Fields in the Santos Basin
The signing of the agreement, called the ‘Government Present’ Program signed on Friday night (06), released R$ 4.2 billion for all 79 municipalities in MS.
-
Austin creates an entire neighborhood for those who lived on the streets for years: a 51-acre community brings together micro-houses, gardens, a cinema, a market, a clinic, and transportation to rebuild lives with permanent housing.
-
Engineers want to carve through Africa with a giant canal to bring water from the world’s second-largest river to a dying lake on the edge of the Sahara Desert that has already lost 90% of its water.
-
Family builds their own barn using two 12-meter shipping containers and a roof between them, spending about 21 thousand dollars after receiving quotes above 100 thousand dollars for a conventional construction.
-
Reusing Styrofoam that would otherwise be discarded, a single bag of cement yields about 50 lightweight blocks measuring 30 by 60 centimeters, intended for partition walls and boundary walls that do not bear structural loads.
According to Marcos Trad, mayor of Campo Grande – MS, several works will be completed through the state program. “The new access to UCDB via Marechal Câmara Street in Jardim Seminário, the resurfacing of Florestal Avenue, the main commercial road of the Coophatralho neighborhood, as well as drainage works that will eliminate a flooding point near the Nova Bahia Terminal, on Cônsul Assaf Trad Avenue, will be concluded,” he emphasized.
R$ 115.7 million will be invested by the city hall of Campo Grande – MS, while the State Government will be responsible for R$ 65.5 million, with R$ 40 million allocated solely for the new access to Moreninhas from Guaicurus Avenue.
Another R$ 1.7 million invested will be allocated to complete the first stretch of the Avenida Rita Vieira extension to Guaicurus.
The investment also includes infrastructure works of nearly 86 kilometers of asphalt and paving that will benefit six neighborhoods of the capital: Nova Campo Grande, Nova Lima (B), Seminário, Sírio Libanês, Atlântico Sul, and Vila Nasser.
The investments also ensure the implementation of more public transport corridors with works to resurface Calógeras, Marechal Deodoro, and Mato Grosso Avenues (a 2.84 km extension from Ceará Street to Calógeras Avenue). The city hall of Campo Grande has already resurfaced the remaining stretch of the road, between Ceará and Hiroshima Street.

Be the first to react!