1. Home
  2. / Job Openings
  3. / Darcy Pacheco Group Has Job Openings for Driver Operator, Load Supervisor, Construction Planning Analyst, Technical Coordinator of Operations, and Sales. Applications for the selection process are accepted by email to work in Bahia, Rio Grande do Norte, and other Northeast states.
Location BA, RN Reading time 3 min of reading

Darcy Pacheco Group Has Job Openings for Driver Operator, Load Supervisor, Construction Planning Analyst, Technical Coordinator of Operations, and Sales. Applications for the selection process are accepted by email to work in Bahia, Rio Grande do Norte, and other Northeast states.

Written by Daiane Souza
Published on 19/07/2022 at 06:41
Grupo Darcy Pacheco tem vagas de emprego para motorista operador, supervisor de carga, analista de planejamento de obras, coordenador técnico de operações e vendas. A candidatura do processo seletivo é por e-mail - Canva
Fonte da imagem: Canva
Seja o primeiro a reagir!
Reagir ao artigo

Darcy Pacheco Solutions is a company focused on vertical and horizontal transportation that emerged in the 1970s. Today, they are leaders in logistics solutions and have numerous job openings being shared in their recruitment process by Human Resources.

On this Tuesday, July 19, Darcy Pacheco Solutions has job openings available for various fields, such as driver operator, cargo supervisor, construction planning analyst, technical operations and sales coordinator. Applications for the selection process can be made via the email recrutamento@grupodarcypacheco.com.br. There, candidates must send their updated resume with all contact information of the institution.

The opportunities are intended for those interested in working in the city of Santa Rita, Rio Grande do Norte (RN) as well as in other cities in the northeast, such as Nova Tanque, Bahia (BA).

Job Openings at Darcy Pacheco Solutions: Join the Selection Process

See below the job openings offered by the Darcy Pacheco Solutions group on Tuesday, July 19, with applications via email. The salaries and benefits offered by the logistics and transportation institution have not been disclosed, and more information will be shared with candidates who are approved in the job interview.

Driver Operator

The driver operator will work with cargo transportation to various states in the Northeast, so it is important to be available for various trips. One of the requirements to apply for the selection process is to have a driver’s license in category C, D, or E and to be over 21 years old – since Brazilian law requires this age to hold one of the mentioned licenses.

It is also necessary for the candidate to have experience using equipment such as LTM 1100. Completion of elementary education is required, and one of the advantages when applying is having completed high school, even though it is not a requirement.

Cargo Movement Supervisor

One of the requirements to apply for the Cargo Movement Supervisor position is that the candidate has basic knowledge of AutoCAD. In addition, a complete higher education in engineering and a driver’s license in category B are required to be able to travel to the workplace.

Having knowledge in various crane operations is a plus when applying for job openings. This position is also intended for candidates interested in working in the Northeast. More information about the city in which they will work has not been disclosed.

Construction Planning Analyst

The construction planning analyst will work on-site in the city of Tanque Novo, Bahia (BA). One of the requirements for applying and working as a construction planning analyst is to have a complete higher education in mechanical or civil engineering along with experience in interpreting technical drawings.

It is also desirable for the candidate to have some experience working in wind farms, although it is not mandatory. Fluency in English is also an advantage for the institution.

Technical Operations Coordinator

The technical operations coordinator must have experience with large cranes simultaneously while having knowledge of maintenance. Having a higher education degree in logistics is also an advantage when applying for the opportunities.

Share in apps