Together With Other Post-Disaster Revitalization Practices In The Municipality Of Mariana, In The State Of MG, There Is Still A Demand For SMS Professionals
In Mariana, PROGEO holds a contract for works and is currently carrying out activities in the civil construction area, foundations, and recovery of structures, requiring Safety Engineers to coordinate, among other responsibilities, the company’s team. If you want to work in this area as a Technician, check out a good opportunity at Aker Solutions here.
Mariana – Requirements And Responsibilities
- SAFETY ENGINEER
- Work Experience In The Position;
- Conduct Trainings And Participate In Kick Off Meetings;
- Manage Contracted Services;
- Release Legal Documentation For The Issuance Of ID Badges And Vehicle And Equipment Access Tags;
- Participate In Incident Analyses Using Quality Tools;
- Monitor Field Activities Of Contractors;
- Develops And Implements Occupational Safety And Environmental Activities, Plans Projects And Productive Activities, And Coordinates Teams, Trainings, And Work Activities. Prepares Safety Documentation According To Legal And Client Requirements. Conducts Visits And Inspections Of Works To Identify Risks And Proposes Actions To Minimize Them.
Desired Professionals Residing In The City Of Mariana – MG Or Nearby Cities. Interested Candidates Should Send Their Resume To vagas@progeo.com.br, With The Subject Line: “Safety Engineer”, By August 28, 2019.
Impact Of The Rejection From The Mariana Disaster Is Minimized With Renaturalization
The Technique Uses Natural Elements And Proves Effective In Recovering The Ecosystem; Logs Placed In The Watercourse Provide Conditions For The Proliferation Of Organisms. Learn More About This Practice In A Special Article In Jornal O TEMPO!
-
While Brazil wants to end the 6×1 work shift, the president of Argentina wants 12 hours for his workers, increasing political tension in the country.
-
The village where two rivers run side by side without mixing in Santarém and Alter do Chão reveals some of the most beautiful freshwater beaches on the planet.
-
Mars is accelerating, and scientists have discovered that the planet’s day is getting shorter, revealing surprising signs of internal activity.
-
Artemis 2 is set to launch on April 1 at 7:24 PM to orbit the Moon with four astronauts, but a class X solar flare and coronal mass ejection could interfere with communications and threaten the launch.

Seja o primeiro a reagir!