Job Openings for Primary, Secondary, Technical, and Higher Education to Work at the Maintenance Company RAK SERVICE in São Paulo. Submit Your Resume!
Company operating in the Energy Generation sector, focused on Preventive and Predictive Maintenance of Hydroelectric Plants, as well as the maintenance of other services, such as Hydraulic Turbines Overhaul and Electromechanical Assembly, offers job openings for candidates with primary, secondary, technical, and higher education. The opportunities are for positions in São Paulo and for different roles such as helper, supervisor, technician, engineer, administrative, mechanic, and much more. See below how to submit your resume!
Also Read
- Finnish multinational, global leader in services for the pulp segments, recruits candidates without experience in SP, MG, and more states for internship program openings
- Company listed as one of the fastest-growing in the Americas opens selection process for home office or hybrid job openings in Rio de Janeiro
- Offshore contracts in Brazil from the multinational oil and gas GranIHC, demand today (09/30) many job openings for primary, secondary, and technical education
- Baterias Moura, leader in the manufacturing of automotive electric batteries, calls for many job openings in its factories in SP, RJ, PE, and more
Check Below the Open Job Positions in São Paulo
- Administrative
- General Helper
- Warehouse Clerk
- Project Coordinator
- Project Engineer
- Power and Control Electrician
- Industrial Plumber
- Turbine Assembly Supervisor
- Assembly Mechanic
- Work Safety Technician
- Planning Technician
- Cran Operator
- General Helper
- Generator Assembly Supervisor
- Assembly Supervisor
- Quality Technician
- Work Safety Technician
- Surveyor
- Adjustment Mechanic
Requirements: the company does not provide the requirements to apply for the job openings listed above, so please update your contact details, courses, certificates, and qualifications before sending your resume.
Application: those interested in applying for the job openings listed above must send their resume, specifying in the subject line of the email the name of the desired position to rh@rackservice.com.br
-
The government opens the vault and deposits R$ 2.6 billion for the construction of Brazil’s first underwater tunnel, with a length of 1.5 km, 870 m under the sea, a total project cost of R$ 6.8 billion, and a 30-year concession.
-
Only 46 meters remain for Brazil and Paraguay to connect via the Bioceanic Route bridge, the project that will link the Atlantic to the Pacific by land and change the logistical map of four countries in South America.
-
The bridge that holds the largest stone railway arch in the world: built over 100 years ago, destroyed in the war, and rebuilt to continue operating to this day, it still carries trains over the Soča River in Slovenia.
-
Italian giant of 130 tons arrives at the Senna Tower construction site and accelerates foundations: Mite CFA 3436 drills up to 50 m, 750 hp engine, investment of R$ 20 million, unique in Latin America.

Seja o primeiro a reagir!