Iguatemi and Catuaí plan a R$1 billion Four Seasons complex in Itaim Bibi, São Paulo. The building will have 26 stories, 104 hotel rooms, 45 apartments in two categories and is scheduled to open in 2030.
A site assembled through years of purchases and demolitions in Itaim Bibi, São Paulo, will be developed into a project valued at R$1 billion, with a luxury hotel and apartments of up to 1,200 square meters. Iguatemi and Catuaí announced plans for Four Seasons São Paulo, a 26-story complex near Avenida Faria Lima, scheduled to open in late 2030.
The project will include 104 hotel rooms, 35 hotel-serviced apartments and 10 private residences. Nine of the residences will measure about 750 square meters each, while the largest will be a penthouse of about 1,200 square meters. The building will also have restaurants, a bar, a spa, a pool, a gym and event spaces. The project is in the permitting phase, a necessary step before construction can begin.
Five properties were bought and demolished to assemble the Itaim Bibi site
The site is between Amauri and Jerônimo da Veiga streets, a short walk from Faria Lima. The area covers about 3,700 square meters in a neighborhood with a high concentration of companies, office buildings and upscale properties, according to a material disclosure published by Iguatemi on November 5.
-
Transnordestina construction mobilizes over 3,000 workers, logs 107,000 trips, and moves 1 million cubic meters of earth in a month in Ceará, enough to cover 140 soccer fields with a 1-meter layer
-
Mutual of Omaha CEO James Blackledge cut the ribbon on a 677-foot, $600 million tower, now Nebraska’s tallest building, where the first 15 floors hold 2,200 parking spaces beneath the offices.
-
Engineers rotate a 36,000-ton bridge nearly 73 degrees in 90 minutes, swinging its 158-meter deck across two rail lines in China without halting construction
-
Brazil’s first underwater bike path to be built 21 meters deep, spanning 1.5 km with free access between Santos and Guarujá
Catuaí Group spent about five years acquiring neighboring properties to assemble the site needed for the project. Older buildings were demolished during the process, making room for a larger-scale development than the structures that once occupied the block.
Catuaí Real Estate CEO Bruno Khouri told Broadcast that the initial plan was to build a high-end office tower. The partners changed course after assessing demand for luxury accommodations in the area. The site, initially intended for offices, will instead house the Four Seasons hotel and residences.

Second tower will have nine 750-square-meter apartments and a 1,200-square-meter penthouse
The new development will be divided into two towers. The first will contain the hotel, with 104 hotel rooms, as well as another 35 furnished apartments for sale. The units will be delivered with finished interiors and will be eligible for a rental program managed by the Four Seasons hotel group.
The second section will contain the 10 largest private residences. It will comprise nine apartments of approximately 750 sq. m. each and one penthouse of about 1,200 sq. m., based on the breakdown provided by Iguatemi. The plan calls for a separate entrance from Jerônimo da Veiga Street for the residences in this section.
The hospitality and social areas will include three restaurants, a bar, event space, a spa, a gym and a pool. Four Seasons will operate the hotel, while the real estate partners will oversee development and sales of the planned units.
The 35 hotel-serviced apartments and the 10 private residences are distinct categories. The former may be included in the brand’s rental program, while the larger residences were designed as independent homes, with their own spaces and separate architectural treatment.
Iguatemi plans R$300 million investment and will own 44% of the project
The total investment, estimated at R$1 billion, includes the cost of acquiring the land, construction and finishing. Iguatemi has announced a financial contribution of approximately R$300 million, to be disbursed between 2027 and 2030. That amount is the company’s planned contribution, not the full value of the project.
A dedicated company will be established for the project. Catuaí will hold a 56% stake, while an Iguatemi subsidiary will own the remaining 44%. Catuaí will contribute its real estate development experience; Iguatemi plans to draw on its relationship with high-income consumers who already frequent its shopping centers in São Paulo.
In its market announcement, Iguatemi estimated a nominal, unlevered internal rate of return of 18% a year on its stake. The calculation is based on assumptions about hotel occupancy, room rates and property sales. The projected return is subject to the project’s future performance.
Iguatemi manages 22 properties, including shopping centers, outlet malls and mixed-use buildings. Its partnership with Four Seasons will mark its first direct move into hospitality, broadening its business beyond retail and the commercial real estate already in its portfolio.
David Chipperfield design will be the firm’s first project in South America
The project will be designed by David Chipperfield Architects, led by British architect David Chipperfield, winner of the 2023 Pritzker Prize. It will be the firm’s first project in South America, according to Iguatemi’s presentation.
The plan calls for two buildings, with green spaces spread across gardens, terraces and outdoor areas. The stated goal is to combine hospitality, residential living and leisure on a compact site while preserving shared spaces and access to the complex’s services.
The project will require approvals, detailed plans and construction contracts before work can proceed. The R$1 billion budget covers different components of the development, but there is no confirmation that construction of the main hotel has begun.
Four Seasons returns to São Paulo after closing its first hotel during the pandemic
Four Seasons has operated in São Paulo before. The brand’s first hotel opened in 2018 at the Parque da Cidade complex, near the Marginal Pinheiros expressway, and closed in 2020. The property became the JW Marriott Hotel São Paulo in 2022, according to information compiled by CNN Brasil.
The partnership with Catuaí will extend beyond São Paulo. The group is also involved in a project to convert the former Hotel Marina Palace in Leblon, Rio de Janeiro, into a Four Seasons property, scheduled to open in 2029. The projects are separate developments, with different locations and construction plans.
In Itaim Bibi, the Four Seasons will be near two major Iguatemi properties: Iguatemi São Paulo, on Faria Lima Avenue, and JK Iguatemi, near Juscelino Kubitschek Avenue. The location can serve business travelers, buyers of the residences, and customers seeking restaurants and wellness services in the area.
Permitting comes before construction, with opening slated for 2030
As of November 2026, the complex remains in the permitting phase. The partners have cited late 2030 as the target opening, subject to approvals and the development schedule. Major construction work cannot begin until those steps are complete.
In the meantime, the companies are preparing the investment structure and architectural plans. Iguatemi’s investment schedule runs from 2027 to 2030, when construction and preparations for the hotel and residences are expected to take place.
The announced project will include 104 hotel rooms and 45 residential units in two categories in one of São Paulo’s most valuable areas. The next tangible change at the site will depend on approval of the new development, following the decision to replace the offices initially planned there with a hotel and luxury residences.
