1. Home
  2. / Uncategorized
  3. / Aker Solutions Celebrates Its One Hundredth Subsea Tree Delivered to Petrobras
Reading time 2 min of reading

Aker Solutions Celebrates Its One Hundredth Subsea Tree Delivered to Petrobras

Written by Renato Oliveira
Published on 15/10/2019 at 10:00
Aker Solutions
Aker Solutions comemora marco
Seja o primeiro a reagir!
Reagir ao artigo

With More Than 300 Subsea Trees Delivered, Aker Solutions Celebrates the Centenary for Petrobras’ Pre-Salt, An Achievement Considered A Milestone for The Company

October 14 will be marked in the history of Aker Solutions in Brazil. The company delivered the one-hundredth subsea tree for Petrobras projects in the pre-salt region. In May of this year, the company’s factory in Paraná delivered a wet Christmas tree to Equinor.

The company has already produced nearly 300 subsea trees for various projects, always with a high level of local content and cutting-edge technology.
Aker also has its valuable contribution with the manufacture of the first subsea tree for the Lula field, the largest oil producer in Brazil.

Petrobras recognizes the value of Aker Solutions in subsea projects and declared through its director, Eberaldo de Almeida Neto, “Aker Solutions has proven the capability and competence, through a highly qualified workforce, to deliver high-quality technology safely.”

The Company

From submarine projects to the surface and from concept to decommissioning, Aker Solutions’ technical experience and strong partnerships provide energy companies with what they need to succeed.
The company started with a small machine shop founded on the Aker River in Oslo, more than 170 years ago, and today has a presence in more than 20 countries worldwide, employing 16,000 people.

In Brazil, in February of this year, Click Petroleum and Gas reported the transaction of Aker Solutions acquiring the remaining 30% needed to gain full control of CSE. The other 70% had already been purchased in 2016.

Read also here on your CPG portal! BNDES (National Bank for Economic and Social Development) study points to a 6.8% growth in investments compared to the previous estimate valid for the period between 2018 and 2021.

Tags
Renato Oliveira

Engenheiro de Produção com pós-graduação em Fabricação e montagem de tubulações com 30 anos de experiência em inspeção/fabricacão/montagem de tubulações/testes/Planejamento e PCP e comissionamento na construção naval/offshore (conversão de cascos FPSO's e módulos de topsides) nos maiores estaleiros nacionais e 2 anos em estaleiro japonês (Kawasaki) inspecionando e acompanhando técnicas de fabricação e montagem de estruturas/tubulações/outfittings(acabamento avançado) para casco de Drillships.

Share in apps