At the request of the participants themselves, the bidding for Wet Christmas Trees, which has not been held by Petrobras for six years, has been postponed
The start date for proposals for Petrobras’s bidding for Maintenance and Repair Services of Offshore Platforms with the supply of parts (UN-BC) is set for September 2. Petrobras obtains environmental license for the installation of the Early Production System of Mero, in the Santos Basin
Read Other News About Petrobras and the Oil and Gas Sector
- Revelations from Operation Lava Jato May Take Golar Power Out of the Bid for Petrobras’s Liquefied Natural Gas Terminal in Bahia
- Prepare for the FOURTH Industrial Revolution, Senai Opens 280 Slots for Free Training Courses in Industry
- GranEnergia and Modec Sign Contract to Support Petrobras Projects Located in the Campos and Santos Basins
The opening of the proposals will start at 3 PM, where four lots with the following values will be presented by Petrobras
- LOT 1 – R$734,833,180.14
- LOT 2 – R$189,492,230.76
- LOT 3 – R$575,816,543.24
- LOT 4 – R$468,459,985.92
The bidding for Wet Christmas Trees, which has not been held by Petrobras for six years, has been postponed to November 30 at the request of the participants themselves.
-
Petrobras announces new oil discovery in the pre-salt of the Campos Basin and reinforces Brazil’s prominence with high-quality reserves that can increase production and energy revenues.
-
Alert in the fuel market: Analysts and a former director of ANP warn that oil prices may worsen in the coming months due to global instability.
-
Ocyan brings executives and digital solutions to Macaé Energy 2026 and highlights offshore expansion with Nexio and a new base in Macaé.
-
Petrobras advances 4.6% with rising oil prices and the dollar, reigniting the debate on macro risks, pricing policy, and fiscal impact in Brazil.
The companies manufacturing the ANMs are eager for the bidding since it will be a large purchase and will involve a lot of money. The bidding includes: 53 sets for the pre-salt and 17 electro-hydraulic distribution units.
The Offer Will Be Divided into Two Blocks
In the first lot, Petrobras will purchase up to 32 sets of Christmas trees and ten distribution units. In the second lot, the state-owned company will acquire 21 sets of Christmas trees and seven Distribution Units.
The lucky winners of the bidding will have to perform installation and provide assistance and maintenance services, supplying the necessary installation tools, control cabins, connectors, and control systems. A single company cannot win both lots.
Aker Signs Multi-million Contract with Equinor and Will Manufacture Wet Christmas Trees in Brazil for the Development of the Oil Field in the North Sea
Equinor announced the investment for the development of the Breidablikk field, with 200 million barrels of oil, a major oil discovery in the North Sea, whose wet Christmas trees (ANMs) and control systems will be produced by Aker Solutions in Brazil.
Estimated at NOK 2.5 billion (approximately US$ 264 million), the contract with Aker provides for the supply of four subsea templates and up to 23 ANMs and associated components that will be linked to the Grane platform.
The project will be carried out at Aker’s facilities in Norway, with deliveries from the UK, Malaysia, and Brazil. The first oil from the field is scheduled for the first half of 2024.
In Brazil, the equipment will be manufactured at Aker’s facility in São José dos Pinhais (PR) – one of the two global subsea innovation hubs of the company, alongside its factory in Malaysia, serving both domestic and international projects.

Seja o primeiro a reagir!