1. Home
  2. / Oil and Gas
  3. / Three Petrobras Platforms To Go Up For International Auction In July
Reading time 2 min of reading

Three Petrobras Platforms To Go Up For International Auction In July

Written by Flavia Marinho
Published on 25/05/2020 at 15:29
Três plataformas da Petrobras vão para leilão internacional em julho
Três plataformas da Petrobras vão para leilão internacional em julho
Seja o primeiro a reagir!
Reagir ao artigo

Petrobras Reported This Monday (25) That It Will Auction Three Semi-Submersible Platforms Operating in the Campos Basin in July

The three semi-submersible rigs P-7, P-12, and P-15 will be auctioned internationally by Petrobras. The platforms operated in the Campos Basin. Petrobras Will Transfer 937 Oil Tankers from the Santos Basin to Rio de Janeiro

Also Read

The international auction of the three Petrobras platforms is scheduled for July and will take place electronically on the Auctioneer João Emílio’s website.

All platforms that will be auctioned on July 9 by Petrobras are not in operation. This information was published in the Official Gazette of the Union on May 25.

The units P-7, P-12, and P-15 are reportedly valued between US$ 250,000 and US$ 400,000 each.

The P-7 unit operated in water depths of 210 meters in the Bicudo and Enchova Oeste fields. The P-12 platform operated in Badejo, Linguado, and Trilha, with water depth of 100 meters. The P-15 produced in Marimba and Piraúna, in water depths of 243 meters.

In February last year, the state-owned company declared its intent to divest its assets, which are nearing their end of useful life.

The auction notice will be available on Petrobras’ Business Channel, click here for more information.

Petrobras Advances Naru Drilling in the Campos Basin to This Month

Petrobras has advanced the drilling of the first oil well in block C-M-657, in the Campos Basin, to this month. The campaign will be carried out at the Naru prospect.

The block was auctioned in the 15th round by Petrobras, in partnership with ExxonMobil and Equinor.

The drillship West Tellus, operated by Seadrill, was in Macaé, near Ilha de Santana, and moved to the site yesterday (21). The unit underwent inspection and maintenance of SPS (special periodic survey), thus allowing the drilling campaign to be advanced.

The drilling of the Naru well may exceed an average of 60 to 90 days. If Petrobras decides to perform a formation test in the area, the campaign may extend by another 30 days, meaning 90 days beyond the timeline set by the company.

Tags
Flavia Marinho

Flavia Marinho é Engenheira pós-graduada, com vasta experiência na indústria de construção naval onshore e offshore. Nos últimos anos, tem se dedicado a escrever artigos para sites de notícias nas áreas militar, segurança, indústria, petróleo e gás, energia, construção naval, geopolítica, empregos e cursos. Entre em contato com flaviacamil@gmail.com ou WhatsApp +55 21 973996379 para correções, sugestão de pauta, divulgação de vagas de emprego ou proposta de publicidade em nosso portal.

Share in apps