Currently, There Are More Than US$ 175 Million in Ongoing Projects in Various Countries Involving Ecman
Founded in 1983, in Bahia, Ecman is part of a business group controlled by TIUÁ Empreendimentos. Ecman has been excelling for years in the Oil and Gas, Chemical and Petrochemical sectors, and also has companies that work with industrial maintenance and equipment logistics. Currently employing about 2,910 employees, the organization has 92 pieces of equipment, such as cranes, tractors, forklifts, and warehouses.
See Also
To date, Ecman has achieved 700 certifications for industrial and infrastructure projects, delivered and approved not only here in Brazil but also in other countries. These certifications are technical and procedural in management, allowing Ecman to operate across a wide range of projects.
Areas of Operation and Growth of Ecman
The Brazilian multinational is present in eight countries in the Latin America and Africa. Ecman has also carried out sanitation projects and the construction of plants focused on potable water and effluent treatment, totaling more than US$ 342 million. It has also carried out road improvements, highways, bridges, airports, ports, terminals, dams, and industrial units.
-
A simple technique of wetting the brick before laying it prevents cracks, improves the adhesion of the mortar, reduces fissures, and ensures stronger walls and more durable constructions.
-
The government opens the vault and deposits R$ 2.6 billion for the construction of Brazil’s first underwater tunnel, with a length of 1.5 km, 870 m under the sea, a total project cost of R$ 6.8 billion, and a 30-year concession.
-
Only 46 meters remain for Brazil and Paraguay to connect via the Bioceanic Route bridge, the project that will link the Atlantic to the Pacific by land and change the logistical map of four countries in South America.
-
The bridge that holds the largest stone railway arch in the world: built over 100 years ago, destroyed in the war, and rebuilt to continue operating to this day, it still carries trains over the Soča River in Slovenia.
Between 2016 and 2020, the multinational demonstrated an average annual growth of 12%, with an EBITDA ranging between 19% and 25%. Currently, there are more than US$ 175 million in ongoing projects in various countries.
Projects Completed in Brazil and Other Countries
Here in Brazil, we can highlight:
- – The construction and provision of civil engineering services for Zumbi dos Palmares Airport in Alagoas (Infraero);
- – Construction and assembly of the Liquefied Natural Gas (LNG) Terminal located at PECEM Port in Ceará (CIPP SA.);
- – The implementation of the reception, storage, and transportation system for sulfuric acid within the Inácio Barbosa Maritime Terminal, interconnecting it to the ammonia sulfate production unit of the Nitrogen Fertilizers Plant in Sergipe (Petrobras);
- – Plant, civil construction, electromechanical assembly, and commissioning at the Industrial Waste Treatment Station of the Rio de Janeiro Petrochemical Complex (COMPERJ).
In other countries, the highlights include the water treatment plant project in Angola, the bridge project in Argentina, and the development of the plant, construction, and operation over 25 years at Tocancipá Airport in Colombia, among other projects.

Seja o primeiro a reagir!