Petrobras Opened The First Leasing Process For The GNL Regasification Terminal In Bahia And Its Integrating Gas Pipeline At The End Of 2019
Petrobras informs in a relevant fact this morning (02/01) that the bidding process for the leasing of the GNL Regasification Terminal in Bahia (TR-BA) and associated facilities has been reopened today. A sad news this morning, Petrobras reports the death of an employee in an accident that occurred yesterday (01/31) on the FPSO Cidade de Mangaratiba
Read Also
- URGENT! Brazil Discovers New Pre-Salt In The Pará-Maranhão Basin With 30 Billion Barrels
- 100 Job Openings For Fundamental Education In The ROLE OF ASSISTANT For Civil Construction Works, Opened By The Constructor Tenda
- 100 Job Openings For Fundamental Education In The ROLE OF ASSISTANT For Civil Construction Works, Opened By The Constructor Tenda
- Keppel Announces Exit From Offshore Platform Construction Due To Sector Crisis
The reopening of the bidding intends to set a new deadline for the accreditation of companies that express interest in participating in the new bidding.
The bidding process opened by Petrobras will be restricted to pre-qualified companies, respecting the conditions presented in the Pre-Qualification Notice of 12/09/2019, available on the state-owned company’s website
-
Petrobras finds high-quality oil in the pre-salt at 113 km from RJ and reignites expectations about strategic reserves in the Campos Basin.
-
Ocyan opens registrations for startups focused on innovation in the oil and gas sector and will select projects for Innovation Day with the support of Nexio.
-
Petrobras announces new oil discovery in the pre-salt of the Campos Basin and reinforces Brazil’s prominence with high-quality reserves that can increase production and energy revenues.
-
Alert in the fuel market: Analysts and a former director of ANP warn that oil prices may worsen in the coming months due to global instability.
The leasing process for the GNL Regasification Terminal in Bahia and its integrating gas pipeline began at the end of 2019. However, the FSRU is not part of the terminal leasing process.
The initiative is in line with the Commitment Agreement for the natural gas market established with the Administrative Council for Economic Defense (CADE) in July 2019, which anticipates Petrobras’ exit from various links in the gas market, such as transportation and distribution.
About The GNL Regasification Terminal In Bahia
The GNL Regasification Terminal in Bahia (TR-BA) consists of an island-type pier with all the necessary facilities for berthing and mooring an FSRU (Floating Storage and Regasification Unit) ship directly to the pier and a supplier ship alongside the FSRU.
The transfer of LNG is done directly between the FSRU and the supplier in a side-by-side configuration. The maximum regasification flow rate of TR-BA is 20 million m³/d.
The gas pipeline integrating the terminal is 45 km long and 28 inches in diameter, connecting TR-BA to two delivery points, the São Francisco do Conde Pressure Reduction Station and the São Sebastião do Passé Flow Control Station.

Seja o primeiro a reagir!