After A Long Stop, It Is Finally Back To Oil And Gas Operations In The Atlanta Field, In The Santos Basin, By Enauta
Enauta brings good news this weekend by announcing the successful resumption of operations at the Atlanta field, its main asset located in the Santos Basin. After a scheduled maintenance shutdown of the FPSO Petrojarl I, the company managed to restart production in the area, boosting its activities in the oil and gas exploration and production sector.
During the maintenance shutdown of the Atlanta field in the Santos Basin, Enauta identified the need to implement improvements to the pump system connectors, which led to operational adjustments during the remaining activity period of the FPSO Petrojarl I. Among these adjustments, the reprogramming of the production of well 7-ATL-2HP-RJS (“2HP”) for the fourth quarter of 2023 stands out.
The decision to reprogram the production of oil and gas in the Santos Basin demonstrates Enauta’s commitment to optimizing its operations and ensuring the efficiency and safety of the Atlanta field. With this strategy, the company aims to maximize the potential of its assets and contribute to the development of the energy sector in Brazil.
-
A study confirms that the natural gas sector will reduce greenhouse gas emissions in Brazil by 0.5% and accelerate the energy transition by 2026.
-
Petrobras implements a severe adjustment and confirms a 55% increase in the price of aviation kerosene with a proposal for installment payments for the companies.
-
The rise in oil prices could ensure an extra revenue of R$ 100 billion for the Federal Government, indicates a recent economic study.
-
Naturgy begins an investment of R$ 1.6 million to expand the gas network in Niterói and benefit thousands of new residences and businesses.
The Resumption Of Oil And Gas Production In The Atlanta Field, In The Santos Basin
The resumption of oil and gas production in the Atlanta field in the Santos Basin represents an important milestone for Enauta, consolidating its position as one of the leading companies in the sector. The company has been dedicated to exploring and producing oil and gas responsibly, adopting measures to ensure the quality and sustainability of its operations.
The gradual resumption of oil and gas production in the Atlanta field in the Santos Basin will occur in accordance with the scope of the Early Production System of the FPSO Petrojarl I, which aims to collect data and confirm the potential of the reservoir. This process is essential for the development of production with the FPSO Atlanta (Definitive System), scheduled for mid-2024.
Enauta emphasizes that, after the ratification of the high productivity potential of the wells and the reservoir behavior over time, operational consistency and the extension of the useful life of the temporarily installed underwater equipment alongside the FPSO Petrojarl I will be prioritized. This approach aims to ensure the continuity of operations and maximize the use of available resources.
Enauta’s Commitment To Oil And Gas Production In The Atlanta Field, In The Santos Basin
The resumption of production in the Atlanta field in the Santos Basin reinforces Enauta’s commitment to operational excellence and sustainable growth. The company will continue to seek opportunities in the oil and gas exploration and production sector, adding value to its shareholders and contributing to the economic development of the country.
Enauta remains steadfast in its mission to promote sustainable development, respecting local communities and preserving the environment. With the resumption of oil and gas production in the Atlanta field, the company reaffirms its role as a key player in the oil and gas industry, driving the economy and fostering progress in the national energy sector.

Seja o primeiro a reagir!