1. Home
  2. / Construction
  3. / Brazil’s Largest Refinery, Replan, Is Offering Over 700 Job Openings for Boilermakers, Welders, Painters, Sheet Metal Workers, and More
Location SP Reading time 3 min of reading

Brazil’s Largest Refinery, Replan, Is Offering Over 700 Job Openings for Boilermakers, Welders, Painters, Sheet Metal Workers, and More

Written by Valdemar Medeiros
Published on 01/07/2022 at 14:00
Updated on 03/07/2022 at 20:14
Maior refinaria do Brasil, Replan, está oferecendo mais de 700 vagas de emprego para caldeireiros, soldadores, pintores, alpinistas e muito mais
Replan, a maior refinaria de petróleo da Petrobras, fica em Paulínia (SP) — Foto: Júlio César Costa/g1
Seja o primeiro a reagir!
Reagir ao artigo

Replan, the Largest Oil Refinery in Brazil, Announced the Opening of Hundreds of Job Vacancies for Professionals Residing in Paulínia (SP). There Are Openings for Carpenters, Forklift Operators, and Many Others; Check It Out!

The largest oil refinery of Petrobras, Replan, has over 700 job vacancies open for professionals from Paulínia (SP). The opportunities are for candidates looking to work on maintenance projects at Replan. It is important to note that the selection process for job vacancies will be intermediated by the Municipal Secretary of Economic Development of Paulínia. The refinery covers a total area of 9,125,000 m² and supplies diesel, cooking gas, gasoline, and other products to nine states in the country.

List of Available Job Vacancies at Replan in SP

We have compiled a list of many of the positions open at Petrobras’ oil refinery; check it out:

  • Carpenter – 2 vacancies;
  • Pipe Helper – 4 vacancies;
  • Forklift Operator – 6 vacancies;
  • Scaffolding Supervisor – 20 vacancies;
  • Insulator – 6 vacancies;
  • Scaffolder – 45 vacancies;
  • Supplementary Cleaning Supervisor – 6 vacancies;
  • Welder – 13 vacancies;
  • Painter Blaster – 8 vacancies;
  • Jackhammer Operator – 2 vacancies.
  • Sheet Metal Worker – 2 vacancies;
  • Industrial Climber Painter – 8 vacancies;
  • Confined Space Observer – 35 vacancies;
  • Observer – 40 vacancies;
  • Painting Supervisor – 2 vacancies;
  • Electrician – 3 vacancies;
  • Insulator – 6 vacancies;
  • Painter – 8 vacancies;
  • Boilermaker – 346 vacancies;
  • Tracer Sheet Metal Worker – 6 vacancies.
  • General Helper – 20 vacancies;
  • Tig/Er Welder – 8 vacancies;
  • Isolation Supervisor – 1 vacancy;
  • Beam Lifter Operator – 6 vacancies;
  • Helper / ASG – 40 vacancies;
  • Load Handling Assistant – 16 vacancies;
  • Industrial Plumber – 2 vacancies;
  • Bricklayer – 2 vacancies;
  • Materials Technician – 1 vacancy;
  • Industrial Painter – 8 vacancies;
  • Climber – 11 vacancies;
  • General Services Assistant – 36 vacancies.

Send Your Resume for Job Vacancies at Replan

Interested candidates must attend the Municipal Secretary of Economic Development, at the Municipal Hall, which will assist candidates from Monday to Friday, from 8 AM to 5 PM. Candidates must present the following documents: updated resume with photo, CPF, PIS Card, ID, Voter Registration, Proof of Residence, and Work Card.

For residents of Paulínia (SP) who are already registered, it will be necessary to update the details by presenting the PIS card and resume with photo.

The Municipal Secretary of Economic Development will forward the documents to the company responsible for the selection. Those who still have questions can get more information by calling (19) 38745669.

Get to Know Replan

Replan is the largest refinery in the country in processing capacity of oil, with a processing capacity of 69 thousand cubic meters per day, equivalent to 434 thousand barrels. Its production accounts for about 20% of all oil refining in the country, processing almost all domestic oil, much of which comes from the Santos Basin.

The refinery in SP is connected to the São Sebastião Terminal, Barueri Terminal, and Guararema Terminal. In addition, Replan is also interconnected to the Terminals of the Distributors of the Paulínia Pool, Petrobras Distribuidora, and the Liquigás Base for LPG.

It is important to note that the refinery was inaugurated in 1972, when the city had just been politically emancipated from Campinas. Its construction began in 1969, and the area where it is located belonged to the former Fazenda São Francisco, which was divided and donated to Petrobras by the City Hall of Paulínia (SP).

The city was strategically selected for the installation of Brazil’s largest refinery, considering that the municipality is only 118 km from the São Paulo capital and its location allows for greater ease of transport, being inserted in a context of great facilities, with access to major transport routes, railways, highways, and much more.

Valdemar Medeiros

Formado em Jornalismo e Marketing, é autor de mais de 20 mil artigos que já alcançaram milhões de leitores no Brasil e no exterior. Já escreveu para marcas e veículos como 99, Natura, O Boticário, CPG – Click Petróleo e Gás, Agência Raccon e outros. Especialista em Indústria Automotiva, Tecnologia, Carreiras (empregabilidade e cursos), Economia e outros temas. Contato e sugestões de pauta: valdemarmedeiros4@gmail.com. Não aceitamos currículos!

Share in apps