Paraíso de Energia announced on the 26th of this month job openings for: driver, administrative area, warehouse, safety work, environment, and leadership positions. The openings are for the state of Minas Gerais. Continue reading the article and check the list of positions and functions.
On October 28, 2016, Alupar became the winner of lot 2 at the Aneel 13/2015 Transmission Auction – 2nd Stage. Paraíso de Energia S.A. is a concession for the public service of electricity transmission through the 500 kV Poções III – Padre Paraíso 2 Transmission Line, with a length of 334 km, and the 500 kV Padre Paraíso 2 – Governador Valadares 6 Circuit 1 Transmission Line, with a length of 207 km, and; the 500 kV Padre Paraíso 2 Substation and the 500/230 kV Governador Valadares 6 Substation.
The project aims to expand the Northeast – Southeast Interconnection, aiming for the adequate outflow of current and future generation projects planned to be implemented in the Northeast region. Located between the municipalities of Poções and Governador Valadares, in the states of Bahia and Minas Gerais, with an implementation deadline until February 9, 2022.
-
The largest deposit of Vale was discovered by accident and today represents almost all the ore produced by the company.
-
The Brazilian Army takes F-5 fighters out of the garage and stars in an air combat with support from the KC-390.
-
In just 3 years, OMODA 5 surpasses 400,000 units and reaches a milestone that takes most cars a decade to achieve.
-
Without cement, without steel, and using only earth and recycled cardboard, engineers have created a construction system that drastically reduces carbon emissions and could change the way houses are built around the world.
About the Openings for Monte Formoso/MG and Teófilo Antoni/MG
- Transmission Line Supervisor – Monte Formoso/MG
- Warehouse Manager – Teófilo Antoni/MG
About the Openings for Padre Paraíso/MG
- Administrative Assistant
- Driver
- Environmental Technician
- Junior Planning Technician
- Senior Planning Technician
- Safety Technician
- Construction Coordinator I – Substation
About the Openings for Governador Valadares/MG
-
- Safety Technician
- Administrative Assistant
- Junior Planning Technician
- Substation Supervisor
About the Openings for Poções/MG
- Construction Coordinator I – Substation – Poções/MG
- Substation Supervisor – Poções/MG
- Safety Technician – Poções/MG
Job Opening for João Camara – RN
- Junior Transmission Line Electrician Requirement: Complete Technical Education – Electrical, Electrotechnics, Electronics, or related fields.
Application
To apply for the positions mentioned in Minas Gerais, Paraíso de Energia requests that candidates register in the talent pool on the official company website, simply CLICK HERE and you will be redirected. The company also asks candidates to send their updated resumes in PDF format to the email rhtalentos@alupar.com.br, and do not forget to indicate the desired position in the subject line. Good luck!
This job is not for you? No problem, share this ad; who knows, someone close to you is waiting for it?!

Seja o primeiro a reagir!