Oil and Gas FPSO Bacalhau: 370-Meter Offshore Unit With Capacity for 220,000 Barrels/Day Starts Operations in Santos Basin Caio Aviz 25/02/2025 at 23:41
Oil and Gas Equinor Completes Installation of the Topsides for the Bacalhau FPSO, Set to Operate in the Pre-Salt Layer of the Santos Basin, With First Oil Expected in 2025 Ruth Rodrigues 21/02/2024 at 22:36