1. Home
  2. Logistics and Transportation
  3. Detour announced for southbound BR-101 drivers heading to Garopaba, Santa Catarina, as Motiva Costeira closes km 264 entrance until June 2027
Leave a comment 5 min of reading

Detour announced for southbound BR-101 drivers heading to Garopaba, Santa Catarina, as Motiva Costeira closes km 264 entrance until June 2027

Author profile image Douglas Avila
Written by Douglas Avila Published on 23/11/2026 at 14:43 Updated on 23/11/2026 at 14:44
Google News
Be the first to react!
React to this article
Prefer CPG on Google

Starting Monday morning (23), drivers heading south on BR-101 will no longer be able to enter Garopaba, Santa Catarina, at km 264. Motiva Costeira has closed the access for earthworks, drainage and paving, directing traffic to continue to km 265, 800 meters ahead, through June 2027.

The change affects drivers traveling from Florianópolis and the Greater Florianópolis area toward the southern coast of Santa Catarina. From now on, the usual entrance at km 264 is closed to southbound traffic.

The concessionaire announced the change in a statement released Friday (20) and reproduced by Garopaba City Hall on Saturday (21). The restriction takes effect Monday morning (23), with no plans to reopen the access before June 2027.

What changes for drivers arriving on BR-101

The statement says traffic at km 264 on the southbound side of BR-101 in Santa Catarina has been rerouted to improve safety for workers and drivers while construction equipment operates beside the highway.

Drivers who want to enter Garopaba at this point must continue past the closed entrance. They are directed to use the next available access at km 265, about 800 meters from the construction zone.

The practical impact is limited: the detour is short. But for drivers familiar with the highway, the change calls for extra attention when slowing down and looking for the correct exit.

The detour is at km 265, 800 meters ahead

The concessionaire says signs at the site have been updated to guide drivers. Signs mark the closure of the km 264 access and point to the next entrance.

The website Ligado no Sul notes that the change affects only the km 264 access for southbound traffic and does not involve a full closure of BR-101. The highway remains open in both directions.

That means drivers passing through Garopaba on their way to Imbituba, Laguna, Tubarão or Rio Grande do Sul will not be affected. The change applies to people whose destination is the city and who used that entrance.

What work is taking place at km 264

Motiva Costeira’s statement describes the project as a set of earthworks, drainage and paving activities along the stretch. An aerial image released by the company shows machinery, disturbed soil and a new stretch of pavement beside the highway.

As of Sunday night (22), the concessionaire had not disclosed the project’s cost, the exact length of the work zone or whether the project will result in a redesigned access, such as a frontage road or a turnaround.

The number of workers at the construction site has also not been disclosed. Those details were not included in the statements reviewed by the news team, published by City Hall, Hora Hiper and other regional outlets.

Garopaba Beach, Santa Catarina, with a fishing boat on the sand, hills and houses in the background
Garopaba, on the southern coast of Santa Catarina, is a destination for travelers heading south on BR-101 in the summer. Photo: Rochele Bagatini/Wikimedia Commons (CC BY-SA 4.0)

Construction is scheduled to continue through June 2027

The concessionaire’s schedule calls for the work to continue through June 2027. The company says the timeline is needed to carry out the work safely.

By the blog’s calculation, starting Monday (23), the km 264 entrance will be closed to southbound traffic for about seven months. Reopening depends on completion of the work and validation of operating conditions along the stretch.

In other words, there is no guarantee the entrance will reopen in early June. The concessionaire says access will be restored only after a final inspection, and drivers should expect to use the detour throughout the first half of the year.

The entire summer will be affected by the detour

The timeline covers the entire 2026/2027 summer season. That includes the vacation period, Christmas and New Year’s, when the concessionaire typically sets up special traffic operations because of increased traffic on the southern stretch of BR-101.

Anyone who has driven south on BR-101 during the year-end holidays knows how busy it gets. For context, ViaCosteira estimated that more than 3.3 million vehicles would travel through the stretch between Paulo Lopes and Passo de Torres from December 19, 2025, to January 5, 2026, according to Engeplus.

In that operation, the busiest day was expected to be December 23, with 223,000 vehicles.

For Christmas, from December 19 to 26, the forecast was about 1.5 million vehicles, and for New Year’s, more than 1.2 million. The concessionaire has not yet released an estimate for next summer or a specific count for the Garopaba entrances.

Who manages this stretch of BR-101

The southern stretch of BR-101 in Santa Catarina, from Paulo Lopes to Passo de Torres on the border with Rio Grande do Sul, is managed by ViaCosteira, a concessionaire that is now part of the Motiva group.

The name appears in more than one form in public statements. The city government refers to CCR ViaCosteira, while Hora Hiper and the company itself use Motiva Costeira. They refer to the same operation.

Other issues along the same corridor are also under discussion. At Morro dos Cavalos, authorization to upgrade two tunnels on BR-101 came with a 180-day deadline for the concessionaire to submit the full project, as the blog has reported.

How to contact the concessionaire

Motiva Costeira can be reached by phone and WhatsApp at 0800 255 5550, which operates 24 hours a day for emergencies and information. The operation’s website is rodovias.grupoccr.com.br/costeira.

The company reiterates its request that drivers obey speed limits and follow signs while passing through the construction zone, where machinery and workers are alongside the road.

Anyone who uses the entrance every day should adjust their route from home and let relatives and first-time visitors know, since the usual exit will not be available for southbound traffic.

What remains unknown

Three questions remain unanswered officially: how much the work will cost, what the final design of the km 264 entrance will be, and whether the June 2027 deadline allows for any partial opening before the work is complete.

I looked for these details in the statements released so far and could not find them. If the concessionaire provides more information about the project, it could change the calculations for people who rely on that entrance every day.

Until then, the route is straightforward for drivers heading south on BR-101 toward Garopaba: pass km 264 and enter at km 265, 800 meters farther on.

Drivers who use the km 264 entrance to reach Garopaba are invited to comment on whether the 800-meter detour to km 265 changes their routine during the summer season.

Sign up
Notify of
guest
0 Comments
most recent
older Most voted
Tags
Douglas Avila

Digital entrepreneur with 16+ years in tech, now 100% focused on AI. CAIO (Chief AI Officer) based in São Paulo, focused on revenue. Bachelor's in Internet Systems from Senac. At Click Petróleo e Gás, I write about technology and innovation applied to Brazil's strategic economic sectors: energy, industry, maritime transport, automotive, science, and engineering

Share in apps
Download app
0
I'd love to hear your opinion, please comment.x