1. Home
  2. Renewable Energy
  3. Massive 766-MWp solar plant in Minas Gerais marks three years of operation after creating about 3,000 construction jobs
Leave a comment 2 min of reading

Massive 766-MWp solar plant in Minas Gerais marks three years of operation after creating about 3,000 construction jobs

Author profile image Andriely Medeiros de Araújo
Written by Andriely Medeiros de Araújo Published on 27/11/2026 at 01:41 Updated on 27/11/2026 at 01:42
Google News
Be the first to react!
React to this article
Prefer CPG on Google

Sol do Cerrado solar plant marks three years of operation in Minas Gerais, with 766 MWp of installed capacity and about 1.5 million solar modules.

The solar power generated by Sol do Cerrado solar plant has the potential to prevent 134,000 metric tons of carbon dioxide (CO₂) from entering the atmosphere each year. Located in northern Minas Gerais, the Aliança Energia project marked its third year of operation on November 24 and is one of Latin America’s largest solar parks.

The estimated environmental benefit of the electricity generation is equivalent to the emissions produced by approximately 100,000 compact cars over one year.

Sol do Cerrado solar plant created thousands of jobs during construction

Before beginning operations, the solar complex generated activity in the regional labor market, creating about 3,000 jobs. Women accounted for 16% of the workforce mobilized during construction, while workers from the surrounding region filled nearly half of the positions created.

Safety was also among the outcomes of the solar park’s construction. No accidents classified as Level 1 or Level 2 have been recorded since work began.

With 766 MWp of installed capacity, Sol do Cerrado can generate enough electricity to meet the residential demand of a municipality with approximately 800,000 residents.

To reach this capacity and ensure the electricity produced can be delivered to the grid, the project includes large-scale infrastructure, such as:

  • Total area of 5,500 hectares;
  • 230-kilovolt transmission line;
  • Approximately 1.5 million photovoltaic modules;
  • 1,280 hectares dedicated to solar equipment installations.
Watch the video

YouTube video

The park connects to Brazil’s power grid through a transmission line that runs 15 kilometers between the Jaíba and Coletora Sol do Cerrado substations, allowing the renewable energy generated in northern Minas Gerais to flow into the National Interconnected System (SIN).

Sign up
Notify of
guest
0 Comments
most recent
older Most voted
Tags
Andriely Medeiros de Araújo

Currently pursuing higher education. Writes about Oil, Gas, Energy, and related topics for CPG — Click Petróleo e Gás.

0
I'd love to hear your opinion, please comment.x