1. Home
  2. Offshore Sector
  3. Brava brings second Papa-Terra well online, completing Campos Basin campaign phase
Leave a comment 2 min of reading

Brava brings second Papa-Terra well online, completing Campos Basin campaign phase

Author profile image Flavia Marinho
Written by Flavia Marinho Published on 27/11/2026 at 11:47
Google News
Be the first to react!
React to this article
Prefer CPG on Google

PPT-53 began producing oil on November 26 after approval from Ibama. With both new wells at the Papa-Terra field in the Campos Basin online, Brava’s campaign is continuing in Atlanta, where first oil is expected in 2027.

Brava Energia brought well PPT-53 online on November 26, 2026, at the Papa-Terra field in the Campos Basin. Operations began after approval from the Brazilian Institute of Environment and Renewable Natural Resources (Ibama), Brazil’s environmental agency, as detailed in the material disclosure filed by the company.

With PPT-53 online, both wells planned for the Papa-Terra field as part of the integrated campaign are now producing. PPT-52 began operating on September 29. The campaign’s other two wells are in Atlanta, in the Santos Basin, and still need to be connected to the production system. Brava’s announcement on the start of PPT-52 production.

PPT-53 was already connected to the floating production vessel before approval

By November, drilling, completion and the tieback of PPT-53 to the 3R-3 floating production vessel had been completed. Completion involves installing the equipment needed to control well production. The tieback connects the well to the facility that receives and processes the extracted fluids.

With those steps complete, PPT-53 was awaiting regulatory approval to begin operating. Production started on November 26, but the well’s initial flow rate has not been disclosed. The Papa-Terra field is in the southern part of the Campos Basin, off Rio de Janeiro. Brava’s report on the campaign’s progress · Field development plan filed with Brazil’s National Agency of Petroleum, Natural Gas and Biofuels (ANP).

Lone Star rig is now working at Atlanta in the Santos Basin

Brava moved the Lone Star from the Papa-Terra field to Atlanta after completing drilling at the Campos Basin field. In Atlanta, the rig began work in November on the phase covering wells ATL-9H and ATL-10H. Brava’s announcement on drilling in Atlanta.

Offshore drilling rig with a support vessel alongside
Lone Star rig in an image released by Brava Energia at the start of the Atlanta phase. Photo courtesy of Brava Energia.

In the schedule released with its quarterly results, Brava said tieback work at Atlanta is set to begin in the first quarter of 2027, with first oil expected in the second quarter. These are the next milestones in the four-well campaign.

Sign up
Notify of
guest
0 Comments
most recent
older Most voted
Flavia Marinho

Flavia Marinho is a postgraduate engineer with extensive experience in the onshore and offshore shipbuilding industry. In recent years, she has dedicated herself to writing articles for news websites in the areas of military, security, industry, oil and gas, energy, shipbuilding, geopolitics, jobs, and courses. Contact flaviacamil@gmail.com or WhatsApp +55 21 973996379 for corrections, editorial suggestions, job vacancy postings, or advertising proposals on our portal.

0
I'd love to hear your opinion, please comment.x