Oil giant installs mega submarine equipment in Campo de Bacalhau and revolutionizes oil and gas production in the Santos Basin region April 7, 2024 — Roberta Souza Industry, Shipping industry
Equinor completes the installation of the topside of the FPSO Bacalhau, which will operate in the pre-salt of the Santos Basin, with 1st oil scheduled for 2025 February 21, 2024 — Ruth Rodrigues Oil and Gas
Another monumental MODEC FPSO, built in a Chinese shipyard, is on its way to Brazil to serve Equinor projects in the Bacalhau field, in the Santos Basin pre-salt May 30, 2023 — Paulo Nogueira Industry, Shipping industry, Oil and Gas
Equinor decides to postpone the start of production at the Campo de Bacalhau project, in the Santos Basin pre-salt, to 2025 due to schedule delays caused by the Covid-19 pandemic February 11, 2023 — Ruth Rodrigues Oil and Gas
Axess Group signs two contracts in the FPSO installation project in Campo de Bacalhau, in the Santos Basin October 14, 2022 — Ruth Rodrigues Oil and Gas
Equinor signs with Schlumberger for the construction and installation of subsea production systems in Campo de Bacalhau June 21, 2021 — Roberta Souza Oil and Gas
Pre-Salt – Siemens Energy signs a contract to supply electrical equipment in a project in the Bacalhau field, in the Santos Basin June 10, 2021 — Roberta Souza Economy, Oil and Gas
Modec confirms order for the construction of the FPSO in Campo de Bacalhau, in the Santos Basin June 4, 2021 — Valdemar Medeiros Oil and Gas
Subsea 7 contracts the German company Butting to produce coated tubes for the Campo de Bacalhau project, in the pre-salt of the Santos Basin November 7, 2020 — Valdemar Medeiros Oil and Gas