In Development by Itaguaí, a Naval Construction Company (ICN), the Ships Designed for the Navy’s Submarine Development Program (PROSUB) Are in Their Final Stages
As far as is known at present, the Navy’s Submarines (PROSUB) from the Brazilian Navy (MB) are already divided into 05 main sections, namely: S1, S2A, S2B, S3, and S. Furthermore, the special highlight of today’s information will be focused solely on sections S1 and S2A.
Read Also
- ICN Completes Transfer of Sections of the Hull of the Second Submarine
- Petrobras Begins Testing in the Forno Area, in the Pre-Salt Campos Basin
- Maritime Services Company in Rio Resumes Hiring
- Second Section of the Second Submarine of PROSUB is Transferred to ICN in Itaguaí
Naval Construction – PROSUB Submarine Characteristics of Section S1

In summary, section S1 is located at the end of the submarine. It is precisely what will determine the direction and stabilized depth limits throughout navigation on the seabed. Undoubtedly, a modern strategy of naval construction.
Thus, an important item for the energy conversion of the PROSUB submarine has also been placed at the end of the submarine – a propeller shaft for better and quieter movement.
-
Could chocolate disappear from the world? Understand why cocoa could vanish in the coming decades and transform the sweet into a rare item.
-
Chinese companies are sharing factories in Brazil to avoid import taxes, reduce costs, and use the country as a production base to sell cheaper in the domestic market.
-
A new giant Navy ship was launched into the sea and promises to expand France’s naval power; the Émile Bertin is scheduled to be delivered in 2027.
-
Gigantic ship with a million-dollar cargo of over 600 luxury cars docks in Santa Catarina.
Naval Construction – PROSUB Submarine Characteristics of Section S2A

In this section of the PROSUB submarine being developed by Itaguaí, the diesel compartments and another 04 engines that serve as a kind of charger for the batteries are located.
Finally, in 2019, there were also advances involving naval construction in PROSUB. With the completion of acceptance tests at the dock and the successful static submersion, which marked the beginning of at-sea acceptance tests for the “Riachuelo” Submarine. Undoubtedly, the first of the four vessels with diesel-electric propulsion planned in the aforementioned Program. The Brazilian naval construction has invested billions.
About the Navy’s Submarine Development Program (PROSUB)

In summary, the Submarine Development Program (PROSUB) of the Brazilian Navy is the result of a technology transfer agreement with the French company Naval Group (formerly DCNS). Signed in 2008 by Brazil and France, it will enable the production of four Scorpène-class conventional submarines. It will also assist in the manufacturing of the first Brazilian nuclear-powered submarine (SN-BR).

Be the first to react!