Applications for those wishing to work on the Thermoelectric works and other undertakings within Porto do Açú close at 17 pm on February 12th.
The Port of Açú, which is actually a port complex, due to the numerous chains of activities that are part of its portfolio of services, started on the 11th a large number of vacancies, Click Petróleo e Gás says this without reservations or exaggerations. Due to the nature of the vacancies made available at the Superintendence of Work and Income of São João da Barra, it indicates that Thermoelectric (GNAI) is already arriving at a crucial moment in electromechanics. Check the charges:
[One_third]
- ASSISTANT COACH
- HYDRAULIC FIREMAN
- CADIST
- BRAZIER
- CONTROL POWER ELECTRICIAN
- MAINTENANCE ELECTRICIAN
- ELECTRICIAN ASSEMBLER
- CARGO HANDLING ENC.
- INDUSTRIAL PLUMBER
- EVS INSPECTOR
[/ one_third]
[One_third]
- DIMENSIONAL INSPECTOR
- INSTRUMENTALIST
- SANDER
- MACARIQUER
- ADJUSTER MECHANIC
- MECHANICAL ASSEMBLER
- INDUSTRIAL ASSEMBLER
- LIGHT CAR DRIVER
- LEVELER
- MUCK TRUCK OPERATOR
[/ one_third]
- BRICKLAYER
- PAINTER CIVIL CONSTRUCTION
- SHEET WELDER
- MULTIPROCESS WELDER
- SCAFFOLDING SUPERVISOR
- MECHANICAL SUPERVISOR - HRSG
- DOCUMENTATION TECHNICIAN
- EIT TECHNICIAN
- PLANNING TECHNICIAN
- PIPE TECHNICIAN
To apply for any of these vacancies in the port of azu, just click on the names of the positions, you will go to the application page of the responsible body. It is worth mentioning that it is necessary to be connected to their Google Drive accounts, as the method is via form.
Make sure you are within the specified assignments to increase your chances of being hired. We checked each of the forms, and none of them puts the obligation to be residents of São João da Barra as a prerequisite, in addition, we have several followers who work in the development, despite not being residents.
be prepared
Techint E&C won the price assessment process carried out by the company Eneva for an EPC Turn Key contract for the construction of the Parnaíba V thermoelectric plant, in Maranhão. On Friday, August 31, the plant participated in the energy auction promoted by the National Electric Energy Agency (Aneel) and won.
The selection processes can start at any time, given the fact that the works will start in the second half of 2019. Check out the details in the full article here.