Industry With 75% of Construction Completed, the 1,294-Meter-Long Bioceanic Route Bridge Is Set to Open in the Second Half of 2026, Reducing Logistics Costs and Transforming Mercosur Trade with Asia Valdemar Medeiros 02/08/2025 at 18:04