Oil and Gas FPSO From Raia Project Leaves Dry Dock Ahead of Schedule and Accelerates Timeline Towards Production in 2028 Andriely Medeiros de Araújo 18/07/2025 at 19:44
Oil and Gas Equinor Will Connect FPSO to Macaé with New Gas Pipeline Andriely Medeiros de Araújo 02/07/2025 at 14:05
Oil and Gas Equinor and Azevedo & Travassos Sign Contract Estimated at R$ 500 Million for the Construction of the Gas Pipeline for the Raia Project in the Campos Basin Ruth Rodrigues 19/12/2023 at 16:55