The Qualiman that is leading the works at the Abreu e Lima Refinery (Renest) has its prelude to resumption announced by Petrobras. After the state-owned company released an official note to the press, more than 1000 workers seeking reemployment in the market showed up at Qualimar to submit resumes, which won the bid to carry out the works at the refinery this year. It took 3 long years of waiting for Petrobras to decide to restart operations at the SNOX construction site.
The contract was signed on March 27, 2017, by Petrobras so that the works could begin immediately, despite having been interrupted for about 3 years. The contractual agreement for the provision of goods and occupational service supplies was sanctioned on the last day 16, in which Qualiman Engineering and Installations will be responsible.
All institutions involved in the process did not want to risk stating an exact number for the amount of people who will be hired, but activities will begin soon. Qualiman, in a meeting with Sintepav this week, listed all the positions and professional qualifications that it will need to carry out activities in road construction infrastructure, paving, and earthworks. The union already has its own resume database, but it is still receiving summaries at the contact (81) 3551-0580, BASTOSTESOURARIA@YAHOO.COM
-
Scientists discover unexpected climate benefit hidden in forest soils related to atmospheric methane absorption.
-
Sandy unproductive land can become a highly profitable area with a simple technique that boosts soybeans and corn to over 100 sacks.
-
The new Kia hatch will have a range of up to 480 km, may cost up to 25,000 euros (around R$ 150,000), and promises to become one of the most affordable electric cars in Europe; meet the Kia Picanto Electric.
-
Viih Tube, former BBB contestant and millionaire, lives in a mansion worth R$ 8.5 million with a heated artificial lake, two cinemas, a complete spa, and a giant playroom of 120 m² for the couple’s children.
and sintepavpefiscalizacao1@gmail.com, according to the union director Leodelson Bastos. Bastos stated that the first contracts will be for maintenance and cleaning of the complex because the construction has been abandoned for a long time, so it is necessary to clean the location first, organizing for the effective start of the works and hiring.
The expectation is that about 1600 workers will be hired. The function of SNOX is to treat the gases produced in the processes of production and conversion of fossil fuels with low pollution levels, such as Diesel S-10. So far, Rnest is producing this fuel at full throttle, which accounts for 30% of all production in Brazil, in addition to LPG gas, oil, and coke. The first refining train is expected to finish in 2018, but the second still does not have a specific date. More detailed information can be found on the official Petrobras website. Source: Diário de Pernambuco https://goo.gl/8D4uYM Update on 3/4/2017 The email to send your resume to the Abreu e Lima Refinery is cv.sx@qualimanengenharia.com.br

Seja o primeiro a reagir!