1. Home
  2. / Uncategorized
  3. / Andrade Gutierrez GNA Açú – The Deadline Expires in September
Reading time 1 min of reading

Andrade Gutierrez GNA Açú – The Deadline Expires in September

Written by Paulo Nogueira
Published on 04/08/2019 at 12:11
Updated on 04/08/2019 at 20:30
ANDRADE GUTIERREZ 2 OBRAS AÇU GNA
Be the first to react!
React to this article


Reinforcing the Last Post About the Works of the GNA I and/or II Thermal Power Plant, the Deadlines and Methods of Applications Are Nearing the End.

To apply through the Employability Network, click here and log in to the Vagas.com site.





Tags
Paulo Nogueira

Graduated in Electrical Engineering from one of the country's technical education institutions, the Instituto Federal Fluminense - IFF (formerly CEFET), he worked for several years in the offshore oil and gas, energy, and construction sectors. Today, with over 8,000 publications in online magazines and blogs on the energy sector, the focus is to provide real-time information on the Brazilian job market, macro and microeconomics, and entrepreneurship. For questions, suggestions, and corrections, please contact us at informe@clickpetroleoegas.com.br. Please note that we do not accept resumes at this contact.

Share in apps