With Several Newly Celebrated and Acquired Assets from Petrobras, Perenco That Set Up in Macaé, Leaves Timidity Aside and Hires for Many Positions in the Campos Basin
For offshore professionals from Macaé and nearby oil-producing regions, Perenco restarted yesterday (13) the vacancies for its recent acquisitions of Petrobras assets. Candidates will likely perform activities in the fields of Pargo, Carapeba, and/or Vermelho, all in the Campos Basin for various positions; see how to apply:
Requirements and Responsibilities
Before proceeding, it is worth noting that all must have offshore experience, courses, and qualifications in their respective areas of interest, which are business and mandatory. The positions are for:
- Nurse: Technical training in Nursing.
- Production Operator and Supervisor: Technical or higher education in Mechanics/Electrics or Mechatronics.
- Power Plant Operator and Supervisor: Technical or higher education in Electrical or Electrotechnics.
- Cabotage Master Level 6: Specific function courses + certification in crane operation desired.
- Safety Technician: Technical training in Occupational Safety.
-
The Brazilian Air Force now has a colossal helicopter: the H125 from the TH-X project arrives with multi-mission technology, capacity for up to 6 occupants, high efficiency in military training and operation in extreme environments, strengthening the training of pilots for the FAB and the Brazilian Navy.
-
The Brazilian Air Force now has a colossal helicopter: the H125 from the TH-X project arrives with multi-mission technology, capacity for up to 6 occupants, high efficiency in military training and operation in extreme environments, strengthening the training of pilots for the FAB and the Brazilian Navy.
-
The Brazilian Air Force now has a colossal helicopter: the H125 from the TH-X project arrives with multi-mission technology, capacity for up to 6 occupants, high efficiency in military training and operation in extreme environments, strengthening the training of pilots for the FAB and the Brazilian Navy.
-
More than a decade of delays: the duplication of Lot 1 of BR-280, between São Francisco do Sul and Jaraguá do Sul, had its project approved in 2013, suffered stoppages and has remained halted since 2022, with only 36% of the services completed.
Interested parties, please send CVs with the name of the position of interest in the email subject line to: curriculos@br.perenco.com. Do not send standard resumes; make them personalized according to the needs of this selection process.
Find out how this transaction occurred and the operations that Perenco will execute, as well as the economic impacts for Macaé and region here, in the article published on November 28, 2018.
- Petrobras Receives Offer Exceeding US$ 1 Billion for Enchova and Pampo Poles in the Campos Basin
- Vallourec Transportes Seeks Offshore Field Technician Professional to Work in Macaé
- EP2C Seeks Operators to Work Offshore on a 14×14 Schedule in Rio de Janeiro on 13/06
- Occupational Safety Technician Being Requested for Resende, Rio de Janeiro


Be the first to react!