Oil and Gas Impressive! P-26 Arrives at Açu Port: See How the Giant That Processed 100,000 Barrels a Day Will Be Dismantled with Revolutionary Sustainable Technology! Caio Aviz 26/11/2024 at 21:46
Uncategorized Petrobras Obtains License to Operate FPSO Anita Garibaldi in Marlim Field, Located in Campos Basin, Rio de Janeiro Roberta Souza 17/08/2023 at 21:26
Oil and Gas FPSO Anita Garibaldi Leaves Jurong Aracruz Shipyard Heading to Campos Basin Ruth Rodrigues 26/04/2023 at 14:12
Oil and Gas FPSO Anita Garibaldi Arrives at Jurong Aracruz Shipyard and Will Undergo Tests and Inspections Before Heading to Marlim Field Ruth Rodrigues 29/12/2022 at 00:30
Industry Chinese Shipyard DSIC Completes Delivery of FPSO Anita Garibaldi, Which Will Be Used by Petrobras for Fuel Production in the Marlim Field Ruth Rodrigues 05/09/2022 at 09:19
Oil and Gas Petrobras Launches Oil Production Campaign in the Pre-Salt Fields of the Campos Basin Ruth Rodrigues 16/08/2022 at 15:38
Oil and Gas Petrobras Plans Revitalization Projects in Campos Basin to Resume Production in Five Mature Fields Ruth Rodrigues 31/07/2022 at 08:51
Industry FPSO Anna Nery Leaves China Heading to Brazil for Oil and Natural Gas Production at Marlim Field in Campos Basin Ruth Rodrigues 13/07/2022 at 21:00
Industry Ibama Authorizes Installation of FPSOs Anna Nery and Anita Garibaldi in Campos Basin for Petrobras’ Marlim Field Revitalization Project Ruth Rodrigues 02/06/2022 at 16:59