After the Mariana Dam Disaster in Minas Gerais, Samarco Will Resume Operations at Approximately 3 Plants Starting in 2019
Four thousand new direct and indirect employees is what Samarco will need to hire to reach its full production, according to market expectations. The company is expected to resume its activities in the first quarter of next year, after obtaining the necessary environmental licenses to carry out its projects. Among these required professionals, according to Dalla Bernardina, are: mechanics, welders, boilermakers, electricians, and various engineers (environmental, production, metallurgical, among others).
Having been halted since 2015 – when a dam collapsed in the city of Mariana, Minas Gerais, resulting in the deaths of 19 people – Samarco will resume operations at 26% of its capacity, which corresponds to one concentration plant in Minas Gerais and another pelletizing plant in Espírito Santo. For this, it already has the necessary workforce: 1,135 direct workers, according to the press office.
-
Dona Floripes is 103 years old, drinks Coca-Cola every day, dances alone at home, makes the doctor wait, and says she doesn’t consider herself old because old is what you throw away.
-
Dona Floripes is 103 years old, drinks Coca-Cola every day, dances alone at home, makes the doctor wait, and says she doesn’t consider herself old because old is what you throw away.
-
Dona Floripes is 103 years old, drinks Coca-Cola every day, dances alone at home, makes the doctor wait, and says she doesn’t consider herself old because old is what you throw away.
-
The 7-seater SUV has become an alternative for those who need space without spending much, combining a 260 hp V6 engine, automatic transmission, and the size of a large utility vehicle for less than R$ 80,000: meet the 2012 Hyundai Veracruz.
However, the utilization of the other three plants in the Espírito Santo complex will occur gradually. It is precisely during these phases that there is an expectation for hiring. According to the president of the Union of Metallurgical Industries and Electrical Material of Espírito Santo (Sindifer), Lúcio Dalla Bernardina, the resumption will indeed occur in stages. “It will be a slow and gradual hiring process. When fully operational with all four plants running, the number of hires could reach four thousand, both direct and indirect, in two years,” he explained. Submit your resumes to Samarco at the address http://www.vagas.com.br/samarco1. Source: Tribuna Online, Terra, Folha Vitória
How to Qualify to Work in Any Field
Nowadays, it is not enough just to be good professionals; you must have qualifications and training in your area of expertise. We will recommend to you two Educational Institutions that are fully recognized by companies, which will prepare you for the market that demands a professional or Technical level.

Be the first to react!