Macaé, Niterói, Petrópolis, and Rio de Janeiro Are the Main Cities with Opportunities at GE, but There Are Openings in Other States in Brazil
The company GE do Brasil is looking for interns and assistants to work in compliance, repair assistant, mechanical aircraft assistant, and engineering internships. The openings are for the cities of Macaé, Niterói, Petrópolis, and Rio de Janeiro, and candidates must be studying or have already completed higher education related to the respective positions. If today’s vacancies are not suitable for your skills, (Copervales) has just announced a massive selection process as well, check here later.
Open Positions Announced by GE
- PCD Inclusion Program
- Supply Chain Internship
- Field Technician
- Electrical Assembly Assistant
- Compliance Internship
- Buyer Router
- EHS Internship
- Lead Control Engineer
- HR Project Analyst
- Mechanical Technician Aviation
- Manufacturing Specialist
- Quality Engineering Internship
- International Trade Intern
- Law Internship
- Mechanic I
- Senior Controllership Manager
- PTR Engineering Coordinator
- Senior Controllership Manager
- Finance Internship – Risk Analysis
- Customer Application Engineering
- Software Services Engineer
- Maintenance Planner
- Supply Chain Financial Intern
- Engineering Internship
- Lead Project Manager
- Production Supervisor
- Engineering Challenge 2019
- Finance and Projects Internship
- Engineering Internship
GE do Brasil, a multinational company present in more than 100 countries, has been headquartered in Petrópolis (RJ) since 2011, where it performs repairs for aeroderivative turbines, in Macaé with an O&G unit, and in Rio de Janeiro at the GE Global Research Center, a company present in the technology sector, and innovation that develops solutions for health, transportation, energy, and lighting across the entire Brazil.
-
The planet registered 420 water conflicts in 2024, the highest number ever documented, and the dispute over rivers like the Nile, Colorado, Tigris, Euphrates, Indus, and Mekong exposes a race for dams that downstream countries already see as a threat of hydrological war.
-
The UN declared in January 2026 that the world entered an era of “water bankruptcy,” a state beyond crisis, in which compacted aquifers, vanished lakes, and rivers that have become seasonal can no longer recover to historical levels.
-
El Niño raises alert in the South with an 80% probability between July and August and could push Paraná and Santa Catarina into a spring of extreme storms, rainfall well above average, strong winds, and hail, in a scenario that threatens to replicate the billion-dollar impacts of the last climatic event in the region.
-
SC Civil Defense issues new observation at 7:50 PM and warns of advancing cold air mass, with a sharp drop in temperature between Monday night and Tuesday morning and lows of up to 2°C in the Southern Plateau.
Click here to apply for the available positions at GE this July, if you have questions, watch the video right below on how to proceed:

Did you know that GE will supply a turbine for the Parnaíba II Thermoelectric Power Plant in Maranhão? Check here for details of the project and stay updated on the latest news about this project.

Be the first to react!