The New Industrial Unit of Aeris Wind Energy, Located Near Porto do Pecém in Ceará, Will Demand 700 Job Vacancies by December
National reference in the manufacturing of wind blades, Aeris is expanding its portfolio in the state of Ceará. The company inaugurated a new factory about 15 kilometers from Porto do Pecém. The Aeris Pecém II industrial unit will be responsible for the creation of 700 new job vacancies by December 2020. Interested in working at Aeris? Check out the job vacancies available at the wind energy company.
Read Also
- Billion-Dollar Investment with Resumption of Infrastructure Works in São Paulo Will Demand 12,000 New Job Vacancies in the Region
- Selection Process Opened by Former Total Combustíveis for Positions of Technician, Operator, Supervisor, and More to Work at Porto Nacional Terminal
- Over 500 Job Vacancies in New Five-Year Contract Signed by Bureau Veritas Group with Energisa Distributor
The new Aeris factory in Ceará is strategically located near Porto do Pecém for receiving raw materials and exporting wind blades, offering a fast and reliable logistical cycle for wind energy parks.
Last year, Aeris Energy and Porto do Pecém transported approximately 2,000 wind blades. This number is three times higher than the movement recorded in 2018, when 683 blades were shipped to wind energy parks around the world.
-
Japan wants to install the world’s largest floating wind farm, with a capacity of 1 GW near the Izu Islands, to supply Tokyo by 2035 and create a plant in the ocean nearly 10 times larger than the current largest floating operation.
-
Germany gives the world a lesson with 124 invisible turbines that generate clean energy without dams, without harming the landscape, and still work when the sun sets and the wind fails.
-
A single solar storm can knock out satellites, wipe out GPS, and leave 40 million people without power for months — and the transformers that protect the grid take 4 years to manufacture.
-
Jordan is spending US$6 billion to build the world’s second-largest desalination plant and transform Red Sea water into drinking water — while Northeast Brazil is still waiting for desalination projects promised more than a decade ago.
About Aeris Energy
Founded in 2010 with the aim of becoming a reference in the wind blade manufacturing market, Aeris Energy has a team that executes processes with simplicity that allows for a safe and clean work environment, aiming for high product quality, waste elimination, and customer satisfaction.
The main factor used to select this area to build Aeris’s first factory in Ceará was the country’s wind map: the region concentrates more than 50% of Brazil’s total wind potential. This fact is significant when considering Brazil’s continental size and the logistical challenges for transporting wind blades.
Ceará Signs Agreement with Chinese Wind Turbine Manufacturer for Offshore Wind Farm Construction
Ceará is considered a pioneer in Brazil in the renewable energy process, which has attracted investments to the region. A memorandum of understanding was signed this Thursday (10), by the state government with the Chinese renewable energy equipment manufacturer Ming Yang Smart Energy Group Ltd to implement an offshore wind farm project on the Ceará coast.
Camilo Santana, governor of Ceará, stated that the state has great potential for generating electricity from renewable sources, especially wind. The Ming Yang project will ensure the state’s growth in the renewable sector, generate jobs, and create income for the people of Ceará, the governor added.

Be the first to react!