The New Industrial Unit of Aeris Wind Energy, Located Near Porto do Pecém in Ceará, Will Demand 700 Job Vacancies by December
National reference in the manufacturing of wind blades, Aeris is expanding its portfolio in the state of Ceará. The company inaugurated a new factory about 15 kilometers from Porto do Pecém. The Aeris Pecém II industrial unit will be responsible for the creation of 700 new job vacancies by December 2020. Interested in working at Aeris? Check out the job vacancies available at the wind energy company.
Read Also
- Billion-Dollar Investment with Resumption of Infrastructure Works in São Paulo Will Demand 12,000 New Job Vacancies in the Region
- Selection Process Opened by Former Total Combustíveis for Positions of Technician, Operator, Supervisor, and More to Work at Porto Nacional Terminal
- Over 500 Job Vacancies in New Five-Year Contract Signed by Bureau Veritas Group with Energisa Distributor
The new Aeris factory in Ceará is strategically located near Porto do Pecém for receiving raw materials and exporting wind blades, offering a fast and reliable logistical cycle for wind energy parks.
Last year, Aeris Energy and Porto do Pecém transported approximately 2,000 wind blades. This number is three times higher than the movement recorded in 2018, when 683 blades were shipped to wind energy parks around the world.
-
Brazilian scientists are simultaneously advancing two research projects on clean hydrogen and driving solutions that could transform the energy matrix, enhance industrial competitiveness, and accelerate large-scale emission reduction targets.
-
Advancement in renewable energy: A R$ 150 million project launched by Petrobras and Finep aims to create state-of-the-art electrolyzers for green hydrogen, strengthening national research and preparing Brazil to compete in a billion-dollar energy market.
-
Illiterate or semi-literate grandmothers were trained to repair solar systems, open rural workshops, and light up homes that still depended on kerosene.
-
The world has bet on green hydrogen as the fuel of the future, but now faces the side effect: producing 1 kilogram requires about 9 liters of ultrapure water, and the largest projects on the planet are precisely in the driest regions of the Earth, where water is already scarce for people.
About Aeris Energy
Founded in 2010 with the aim of becoming a reference in the wind blade manufacturing market, Aeris Energy has a team that executes processes with simplicity that allows for a safe and clean work environment, aiming for high product quality, waste elimination, and customer satisfaction.
The main factor used to select this area to build Aeris’s first factory in Ceará was the country’s wind map: the region concentrates more than 50% of Brazil’s total wind potential. This fact is significant when considering Brazil’s continental size and the logistical challenges for transporting wind blades.
Ceará Signs Agreement with Chinese Wind Turbine Manufacturer for Offshore Wind Farm Construction
Ceará is considered a pioneer in Brazil in the renewable energy process, which has attracted investments to the region. A memorandum of understanding was signed this Thursday (10), by the state government with the Chinese renewable energy equipment manufacturer Ming Yang Smart Energy Group Ltd to implement an offshore wind farm project on the Ceará coast.
Camilo Santana, governor of Ceará, stated that the state has great potential for generating electricity from renewable sources, especially wind. The Ming Yang project will ensure the state’s growth in the renewable sector, generate jobs, and create income for the people of Ceará, the governor added.
