Construction Couple finishes building PVC chalet on the beach on the last day, with air conditioning and curtains, but discovers the bathroom drain is inverted: water escapes from the drain, risking breaking the floor, and the rush continues before the trip. Carla Teles 31/03/2026 at 17:37
Interesting facts Couple Builds 35 M² Chalet in 7 Days With Mezzanine, Uses Polyurethane Roof Tiles and Aluminum Blanket to Speed Up, Invites Neighbor to Help Assemble, and Discovers That Rushing Shows in the Finish Later When the Stairs Are Done and It’s Windy. Bruno Teles 13/02/2026 at 22:46
Construction Couple from Goiás Transforms Trash into Treasure: Builds Entire Cabins with Tires, Pets, and 25,000 Glass Bottles, Creates Furniture with Toilets, and Assembles a Sustainable Paradise in Their Backyard Carla Teles 17/01/2026 at 22:41