Job Openings for Salvador and Metropolitan Region, Send Resume Urgently by Today for Civil Construction Works in the City
If you are a construction professional and are available to work in Salvador, the capital of Bahia state, please send your resumes urgently for jobs in the city by this Friday (06). Also, see: Safety Technician for Projects and Large Enterprises in the Same Area.
It is important to highlight that the job openings for temporary works of 60 days, the HR has decided to keep the company’s name hidden to avoid crowds and unnecessary disturbances at the contractor’s/client’s service entrance. Below, you can carefully assess and analyze the requirements, benefits, and other duties related to each requested position:
Mason |
painter |
Laborer |
Electrician I |
| Salary: 1,774.94 | Salary: 1,774.94 | Salary: 1,009.52 | Salary: 1,334.45 + 30% |
| Schedule: 44h Day | Schedule: 44h Day | Schedule: 44h Day | Schedule: 44h Day |
| Food: R$ 13.10 | Food: R$ 13.10 | Food: R$ 13.10 | Food: R$ 13.10 |
| Transport: 2x R$ 4.00 | Transport: 2x R$ 4.00 | Transport: 2x R$ 4.00 | Transport: 2x R$ 4.00 |
| Temporary: 60 days | Temporary: 60 days | Temporary: 60 days | Temporary: 60 days |
Those interested in these job vacancies in civil construction works in Salvador can send their resumes to the email rhclienteoculto@gmail.com, informing in the subject line the name of the preferred position. Note: Although the domain is GMAIL, the contact is real and verified by our team.
-
Kia emerges with the “ugliest pickup truck in the world”: even with a 2.2 turbo diesel engine with 210 hp, 4×4 traction, a capacity of 3.5 tons, and a goal of 20,000 annual sales, the Tasman sells only 320 units and becomes a problem for the brand in Australia.
-
Kia emerges with the “ugliest pickup truck in the world”: even with a 2.2 turbo diesel engine with 210 hp, 4×4 traction, a capacity of 3.5 tons, and a goal of 20,000 annual sales, the Tasman sells only 320 units and becomes a problem for the brand in Australia.
-
Country ‘tears’ the sea with 340-meter underwater tunnels under the Atlantic to capture saltwater and build a megaproject capable of producing up to 100 million liters of drinking water per day in West Africa.
-
Country ‘tears’ the sea with 340-meter underwater tunnels under the Atlantic to capture saltwater and build a megaproject capable of producing up to 100 million liters of drinking water per day in West Africa.
There Will Be Economic Activity in the Northeast with Offshore Projects Starting in 2020
Not only does the Northeast live off construction, especially Salvador, but the oil and gas industry will be quite active in the Northeast region with the decommissioning of several offshore platforms, generating jobs and income through operations. Learn more about this milestone and how to prepare by accessing the article here.

Be the first to react!