Ceará Court Confirms Compensation of R$ 127 Thousand Against ENEL for Unjustified Delay in Approval of Solar Energy System Installed in Residence in Crato.
The delay in the approval of a solar energy system installed in a residence in the interior of Ceará ended in a court ruling. The utility company ENEL was ordered to pay R$ 127 thousand to a consumer in the municipality of Crato for moral damages and the delay deemed unjustified in the process of integrating the solar panels into the electrical grid.
The decision was confirmed on February 13 by the 2nd Recursal Panel of the Special Courts of Ceará. Thus, the company’s request for reduction or cancellation of the previously applied fines was denied.
The case began back in 2023. At the time, the resident installed solar energy panels in his house and started the administrative procedure for approval with the utility company.
-
The era of solar panels attached to roofs is beginning to change with transparent glass that generates energy while keeping the view unobstructed, and perovskite photovoltaic windows already tested in offices in Japan promise to transform entire facades into invisible power plants without blocking light or altering the appearance of buildings.
-
The era of silicon alone in solar energy comes to an end with the arrival of perovskite, a material that captures a broader light spectrum, is applied as a thin film, and, together with silicon, reaches a theoretical limit of 45% efficiency in tandem modules.
-
Fernando de Noronha begins unprecedented energy transformation with a R$ 350 million solar plant that promises to replace diesel generation and change the island’s sustainable future by 2027.
-
While Europe and the United States rush to save their own solar chains, China already dominates more than 80% of the global manufacturing of solar panels and has turned the sun into an industrial machine controlled by Beijing that is redefining the global energy transition.
However, even after several attempts, the integration of the system into the electrical grid was denied without justifications considered valid by the Court.
Court Order and Prolonged Noncompliance
Faced with the denial, the consumer turned to the Judiciary. The presiding judge of the Special Civil and Criminal Court of Crato, Dr. Ângelo Bianco Vetorazzi, determined the obligation to comply, establishing a daily fine in case of noncompliance.
Nonetheless, according to the proceedings, ENEL took almost a year to comply with the court order. This delay resulted in the accumulation of daily fines and the maintenance of the condemnation for moral damages.
The utility company attempted to appeal. However, the request was denied both in the first instance and in the Recursal Panel, which upheld the decision in full.
Role of the Judiciary in Consumer Protection
For the attorney of the plaintiff, Mauro Silvestre, the case highlights the importance of the Judiciary in defending consumers against companies that operate essential services.
“The judiciary in Ceará has adopted a stance of protecting consumers who are in a condition of hyper vulnerability, especially as they are subject to the service times of these companies,” highlights Silvestre.
Moreover, the episode reignites the debate about access to solar energy in Brazil. Although this market has been growing, many consumers still report difficulties in the connection process to the electrical grid. The approval is a mandatory step for the system to begin generating credits and effectively reduce the electricity bill.
In the meantime, experts point out that delays like this can discourage investments in renewable sources. After all, those who decide to invest in solar energy expect financial returns and legal certainty.