The Toniolo Group Started Job Openings to Support Mining Projects and Works in MG, Check Below the Open Positions and How to Apply.
Check the job openings for mining works in Brumadinho – MG, currently open today, November 27, by the Toniolo Group, which has been working for over 10 years in projects related to tailings dam maintenance. Professionals from all over Brazil can apply; the company offers accommodation! Apply as well, Isotec Engineering Contracts in Mexico Demand Many Job Openings for Brazilians
Read Also
- Odebrecht Loses Control of Atvos in Court, One of Brazil’s Largest Ethanol Producers
- Bulldozer, Excavator, Loader Operator and Driver Called for Openings at Skava Minas
- Million-Dollar Investment in the Northeast: Total Will Create 900 Jobs to Build Wind Farms in RN
The Toniolo Group has been active for over 10 years in projects related to tailings dam maintenance. The Toniolo Group was a PIONEER in the development and construction of amphibious excavators used in Brazil. It also developed tailings relocation techniques with the help of amphibious excavators, which allowed several dams to increase their lifespan, as the technique developed by the group controls and plans the waste occupation in the dam, ensuring water quality and increasing the mechanical stability of the tailings.
ATTENTION! Click Petroleum and Gas is not responsible for applications; the job openings posted below are external and may be filled at any time.
-
Windows without a prison-like appearance gain momentum in 2026 and promise to completely transform residential facades with more natural lighting, discreet security, increased property value, and a modern look without the burden of the old iron bars that dominated Brazilian homes for decades.
-
How much does it cost to make a radier? A shallow foundation can speed up the construction and reduce stages, but poorly compacted soil, excess load, and design errors can turn the concrete slab into cracks, structural settlements, and much higher expenses later on.
-
Goodbye steel rebar? Scientists create 3D-printed plastic reinforcement that “bites” into concrete, prevents corrosion, and could change beams, slabs, and bridges in civil construction.
-
End of heavy manual drilling: three robots take over more than 9,000 holes in the Engelberg tunnel in Germany, working at a height of 7.5 meters and increasing precision in construction carried out with traffic in operation.
The Job Openings for Brumadinho – MG Were Announced Through the Official News Outlet of the Toniolo Group. Next, Check the Stages of the Selection Process and the Correct Way to Apply.
Machine Operator
Requirements: Experience with hydraulic excavator operation.
Environmental Technician – Brumadinho / MG
Requirements: Experience in VALE processes.
Deckhand
Requirements: The company seeks a professional to operate a boat in a dam (Mining); a maritime registration is required.
Benefits: The company offers candidates Meal Voucher, Food Voucher, Health Insurance, and accommodation for residents from other regions.
Application
Interested candidates for the job openings above should send their resume with salary expectations in the body of the email to rh@grupotoniolo.com , including the job title in the subject line. Example: “Welder-Fabricator – Colombo / PR”.

Be the first to react!