Toyo Setal Wins Bid for Works at Comperj, Which Has Been Halted Since 2015, Estimated Creation of 5 Thousand Jobs
A bidding process at Comperj that had been ongoing for a year has finally ended with Toyo Setal’s victory. The work will complete the construction of the utilities for the enterprise. In August, MIP Engenharia Concluded the Assembly of the Flare at Comperj.
The Comperj works in Itaboraí, which had been halted since 2015 and already has the UPGN being constructed by Kerui Metodo, will now have another important part being resumed.
Toyo Setal signed the contract on September 16, and Petrobras is expected to issue the service authorization in October. The deadline for the completion of the works is 18 months, and the expectation is to create 1 thousand direct jobs and an additional 4 thousand indirect jobs.
-
Government announces R$ 370 million for those who preserve the forest and an unprecedented initiative places traditional Amazonian communities at the center of conserving a vast area.
-
A family from Martins, in the interior of RN, planted seeds in their backyard that no one remembered where they came from and harvested a green and yellow fruit resembling the Brazilian flag; the nickname “World Cup pumpkin” caught on before they discovered what had actually grown there.
-
Most people use a tape measure their whole lives without ever understanding why some numbers are painted red; the explanation lies in a 16-inch spacing that is invaluable for those who work with walls and wood.
-
Without ATMs, with social networks blocked and travel controlled by the government, Eritrea challenges the modern world and reveals why it is called the “North Korea of Africa.”
The commercial manager of Toyo Setal, Rafael Lima, commented on the importance of signing the contract, “This is an extremely important contract for Toyo Setal, as it represents the resumption of our relationship with Petrobras, traditionally our biggest client,” he said.
The difficulties in winning the competition were also highlighted, given that Petrobras only accepted registered companies with proven capacity, and the number of companies, due to the crisis that reduced the order book, also greatly influenced the offered price.
Economic Recovery
The city of Itaboraí and the surrounding region were greatly impacted by the halt of works in 2015 by Petrobras and contractors, leading to a severe economic and social crisis with thousands of people losing their jobs, having to rely on small services or help from relatives to survive.
The utility works at Comperj are a relief for the municipality of Itaboraí, even if the jobs generated by Toyo are not those anticipated at the time the petrochemical complex was planned.
The government is awaiting a feasibility study to determine whether to move forward with the refinery project with the Chinese company CNPC or not.
How to Apply for the Toyo Setal Project
Toyo Setal, anticipating the signing of the contract with Petrobras, has already made a communication channel available for candidates to participate in the enterprise.
Interested parties should send their resumes to the email rhitaborai@toyosetal.com and indicate the position they are applying for in the subject line. Only resumes that include the position in the subject line will be considered.

Be the first to react!