Nearly 4,000 Jobs Will Be Created With the Construction of the First and Only Multimodal Logistics Platform of the North-South Railway in Rio Verde, Goiás.
Almost 4,000 job vacancies in Goiás for the construction of the first and only multimodal logistics platform of the North-South Railway, between the stretch of the city of Porto Nacional (TO) to the municipality of Estrela D’Oeste (SP). Also check out, The government will connect the Port of Itaqui, in Maranhão to the Port of Santos by railway.
The mayor of Rio Verde, Paulo do Vale announced the excellent news during a press conference on Wednesday, the 11th, “It will be the second largest platform, losing only to the one in Rondonópolis (SP).”
-
Scientists discover unexpected climate benefit hidden in forest soils related to atmospheric methane absorption.
-
Sandy unproductive land can become a highly profitable area with a simple technique that boosts soybeans and corn to over 100 sacks.
-
The new Kia hatch will have a range of up to 480 km, may cost up to 25,000 euros (around R$ 150,000), and promises to become one of the most affordable electric cars in Europe; meet the Kia Picanto Electric.
-
Viih Tube, former BBB contestant and millionaire, lives in a mansion worth R$ 8.5 million with a heated artificial lake, two cinemas, a complete spa, and a giant playroom of 120 m² for the couple’s children.
The company responsible for the implementation will be Grupo Rumo Engenharia, which is already responsible for other ventures of this type in São Paulo.
The investment will be around 400 million reais, with R$ 160 million in 2020, and another R$ 140 million in 2021. “Approximately 1,600 jobs will be generated initially, aside from the 500 jobs from the company responsible for the production of the tracks that is already underway, and then during the operational phase, an additional 1,800 job vacancies, including 800 direct and 1,000 indirect. In addition to all the truck drivers and other professionals that will be drawn to this venture,” described the mayor.
- 800 job vacancies for next year forecasted by Modec to serve the offshore and corporate sector
- SENAI and SESI will train 800,000 youths from Bolsa Família and the Cadastro Único
- 7,000 job vacancies in Bahia for the construction of the Salvador Bridge
- Record niobium production in 2019 positions Brazil as a world leader in this type of exploration
- Job vacancies for welders, riggers, painters, operators, mechanics, electricians, technicians, pumpers, and maritime workers
The Secretary of Sustainable Development, Denimárcio Borges, states that entities like Senai, will help with the necessary training so that everyone can participate in job opportunities. “According to Proden (Rio Verde Development Project), 70% of jobs are legally required to be locally hired,” the mayor added.
According to the mayor, “technical studies proved that the first area could not support the venture, but a new technical study found a new area, which is even close to the initial area, which will not go unused, as other companies are already interested in using the area and settling in our region with the arrival of the Platform.”
The president of the Rio Verde Development Council (Coderv), Eduardo Lobo, added that entrepreneurs in any investment will have support from the entities to participate with this growth and progress with the arrival of the Platform.
The documents for the venture are scheduled to be signed on December 19, with the President of the Republic, Jair Bolsonaro, and the governor himself expected to be present.
According to the president of Comigo, Antonio Chavaglia, this achievement will directly impact the sale, distribution, and delivery of raw materials produced in Rio Verde and the surrounding region, especially concerning grains.
https://www.youtube.com/watch?v=CyawqarMe8U

Seja o primeiro a reagir!