Job Openings to Work in São Paulo at the World’s Largest Wind Turbine Manufacturer, Vestas! Submit Your Resume.
Multinational Vestas is holding an open selection process for candidates with and without experience. The job openings are for positions in São Paulo. Submit your resume and build your career at the world’s largest wind turbine manufacturer!
Vestas Announces Investment of R$ 1 Billion for Wind Energy Project in Paraíba, Expected to Generate 600 New Jobs.
The governor of Paraíba, João Azevêdo, signed a letter of intent with the Danish wind energy company Vestas at the Palácio da Redenção, located in João Pessoa, at the end of last month. The company is developing a project for the installation of wind energy parks, aiming to bring the projects to the municipalities of Araruna, Riachão, Cacimba de Dentro, Cuité, and Damião. The project, named Fragata, promises to generate approximately 600 direct and indirect jobs during the construction phase.
-
Labor shortage: Switzerland is ‘desperate’ to find 40,000 workers, and Brazilians in this situation can apply.
-
Thicker walls become a thermal solution in Brazil by reducing internal heat by up to 30% without air conditioning, using thermal inertia, double walls with air, adobe, and roofs that can cut heating by up to 10°C.
-
Brazil reaches the lowest unemployment rate in history and launches job openings, internships, and 10,000 free courses in 2026.
-
At 625 meters above the ground and with a span of 1,420 meters between mountains, China inaugurated the highest bridge in the world — and the 2-hour journey now takes 2 minutes.
The turbine manufacturer Vestas also has plans in Bahia, aiming to build a second maintenance center. The site concentrates a significant part of the facilities, generating even more jobs for the region. It is a quite significant impact, not only on the production of wind turbines.
The company has its unit in Aquiraz; however, it also produces blades and towers through partners with projects, with designers who are also a vector for job generation.
The first turbine installed by the company was in Fernando de Noronha in the 2000s. And more recently, in the last twelve years, the company has had a very significant presence with investments and the localization of wind turbine technology.
Check Below for Job Openings by the Wind Turbine Manufacturer in São Paulo
Quality Intern: Studying Engineering (2 years until graduation preferred), Fluent in English, Spanish is desirable.
Contract Administrator: Bachelor’s degree in Law. Engineering, Management, and other related degrees may be accepted if the candidate has experience with Contract Management; 5+ years of experience with energy/infrastructure agreements; experience in the wind energy industry is considered an advantage; good communication skills in English (and local language) for drafting, reviewing, and negotiating Contracts.
Graduate Program – Business & Commercial: Must have or complete by September 2023 a relevant master’s or bachelor’s degree from the university with limited full-time work experience after graduation. We are open to various educational backgrounds; have a solid understanding of business concepts; have an international mindset and preferably lived or studied abroad; possess a valid visa/work permit in the country you are applying to; be fluent in English, both verbally and in writing.
Sales Engineer: Bachelor’s degree (or equivalent work experience) in Engineering; Fluency in English is required, Spanish is desirable; good business skills; good general knowledge of office packages, and SAP is considered; 1 to 3 years of experience in a similar position, preferably in the energy sector.
Application: Those interested in the job openings above should click on the desired position to submit their resume or click HERE.

Seja o primeiro a reagir!