Job Openings for Working on UPGN Projects at Comperj, Today August 20. Submit Your Resume!
Attention professionals from Itaboraí and surrounding areas, do you want to work for an industrial services provider that values each one of its employees?! STERN SERVICE is constantly growing and is looking for people to join the team for another contract of thermal insulation, passive fire protection, assembly and disassembly of scaffolding on the equipment of the Natural Gas Processing Unit (UPGN) of Petrobras, Comperj, in Itaboraí-RJ. See below the positions available and how to submit your resume.
Read Also
- Getulio Vargas Foundation is offering 130 free online courses with certificates in the fields of humanities, technology, and exact sciences
- Company offers over 100 URGENT job openings for remote work with competitive salary
- Oil evaporates under strong selling pressure reaching US$ 66 a barrel and pressures Petrobras in the decrease of gasoline, which experienced another increase on August 12
- Direct sales from ethanol plants to gas stations generate benefits for consumers who will have lower prices and quality
Check Below the Positions Called for Petrobras Contracts at Comperj
- Planning Technician
- Planning Assistant
- Safety Technician
- Quality Control Technician
- Quality Control Assistant
- Materials Technician
- Administrative Assistant
- Storekeeper
- Crane Driver
- Scaffolding Supervisor
- Thermal Insulation Foreman
- Passive Protection Foreman
- Scaffolding Foreman
- Sheet Metal Worker Layout
- Sheet Metal Worker Assembler
- Insulator
- Painter (Intumescent Epoxy)
- Scaffolder
- Helper
Requirements: The company does not provide the requirements, so before sending your resume, update your contact details, courses, certificates, and qualifications.
Application: Those interested in applying for the job openings for UPGN projects at Petrobras in Comperj should send their resume mentioning the position name in the subject line of the email to curriculo.rj@sternservice.com.br
-
The project approved by the federal government plans the construction of a mega railway that will cross 24 cities, cost 6.6 billion reais, and transform the logistics map of the Southeast by connecting Espírito Santo to Rio de Janeiro.
-
While in Brazil a 10-story building takes 2 years to complete, in China a company stacks pre-fabricated modules and raises the entire building in just 28 hours and 45 minutes.
-
Man spends 100 days building a wooden cabin on a volcanic island and transforms a hostile forest into a complete shelter with insulation against the cold, a cultivation area, and a structure made with natural resources.
-
The backhoe digs a large pool at 6 meters and opens a giant water fountain: sand rises from the bottom, drains with pipes and gravel hold, and the flow reaches 110 thousand liters per hour, nonstop.

-
Uma pessoa reagiu a isso.