As of Saturday (22), a major highway will be fully closed for the construction of a new reinforced concrete viaduct. The National Transportation Infrastructure Department (Dnit) has not disclosed the estimated completion date of the works.
Traffic on BR-304, one of the most important highways in Rio Grande do Norte, will be altered starting Saturday (22).
The change is due to the closure of a stretch in the municipality of Macaíba, located in the Metropolitan Region of Natal.
The reason for the closure is the construction of a reinforced concrete viaduct, a project that promises to improve traffic flow and ensure greater road safety.
-
A traditional SC supermarket will be demolished to make way for a new R$30 million unit in Porto Belo, featuring 4,400 sq m, 140 parking spaces, and a promise to accelerate the chain’s expansion on the Santa Catarina coast.
-
NASA explains 5 curiosities that intrigue millions of people, from the red Moon in eclipses to the ancient rivers of Mars, to the risks of a human trip to the planet and to the 2026 eclipse that many people want to see in Brazil.
-
China is dumping tons of sand in the South China Sea with dozens of dredgers to transform a disputed reef into a giant artificial island and bring back the “Great Wall of Sand” in the ocean
-
Government removes families from their homes without compensation for the construction of a R$ 646.8 million BRT corridor and leaves residents without access to R$ 24.2 million in SP.
However, during the construction period, drivers will need to deal with detours and a possible increase in travel time.
Change in Traffic and Impact on Drivers
According to the National Transportation Infrastructure Department (Dnit), the closed stretch is located near kilometer 301 of BR-304.
During the execution of the services, the flow of vehicles will be diverted to the side streets, which should absorb the traffic demand while the work is taking place.
The Dnit reported that the area will be properly marked, ensuring that drivers and pedestrians have the necessary guidance to follow their routes safely.
However, the agency has not provided an official forecast for the completion of the work, which means drivers should prepare for potential prolonged impacts on mobility in the region.
Traffic experts warn that, in the first few days of the closure, traffic is likely to be slow, especially during peak hours.
Drivers who regularly use BR-304 should plan their trips in advance to avoid disruptions.
Why Is the Construction of the Viaduct Important?
BR-304 plays a key role in the economy and logistics of the state of Rio Grande do Norte, serving as a fundamental route for the transport of goods and passengers.
The affected stretch by the closure is an area with intense vehicle flow, and the construction of the viaduct is part of a plan to improve road infrastructure and reduce traffic bottlenecks.
The main goal of the project is to increase safety in the area and reduce the occurrence of accidents, as well as to facilitate urban mobility in a region that receives a large number of vehicles daily.
With the viaduct, it is also expected to decrease travel time, avoiding the frequent congestion that occurs in the area.
What Are the Alternatives for Drivers?
With the closure of the main lane and the diversion of traffic to the side streets, drivers need to seek strategies to minimize disruptions during the construction period.
Some recommendations can help in this process:
- Use navigation apps like Google Maps and Waze to monitor real-time traffic conditions and find alternative routes;
- Avoid peak hours by leaving in advance for important commitments and reducing exposure to heavy traffic;
- Opt for public transportation whenever possible, to decrease the volume of vehicles on the highway;
- Carpool, contributing to the reduction of the number of cars on the road and improving traffic flow;
- Stay alert to signage and the guidance of responsible agencies to ensure safe driving.
Possible Long-Term Effects
Although the project will cause temporary disruptions for drivers, the expectation is that the construction of the viaduct will bring significant benefits to mobility on BR-304.
The modernized infrastructure can positively impact not only local traffic but also the logistics of transporting goods and the economic development of the region.
Furthermore, road safety will be enhanced, reducing the number of collisions and pedestrian accidents in the area.
Studies indicate that investments in road infrastructure significantly reduce the number of accidents on heavily trafficked highways.
For experts, the closure of a stretch of BR-304, in the municipality of Macaíba, is a necessary measure for the construction of a viaduct that, in the future, will improve traffic and ensure greater safety for drivers and pedestrians.
However, the impacts on traffic may be prolonged, as Dnit has not set an exact deadline for the completion of the work.
Drivers should plan ahead, adopt alternative routes, and pay attention to signage to avoid surprises and minimize disruptions. With patience and organization, it will be possible to navigate this period of change without major difficulties, awaiting the benefits that the new road structure will bring to the region.

Be the first to react!